This page centralizes documentation relating to the module loading, integration, and quality control/assurance testing of the Inner System, part of ATLAS' Inner Tracker Pixels Phase II upgrade project.
Module loading pages
Building 33: Module loading equipment
Consumable components for mixing and dispensing SE4445A list of consumables required for mixing SE4445, storing it in syringes, and dispensing it with the Janome robot. The linked page includes the information required to place orders for each item. |
Mixing SE4445
Storing SE4445
Operating procedures
Building 33 - Glue freezer monitoring setupPage describing the setup of the LabJack 7 + thermocouples, as well as monitoring software, PC setup, network setup. | |
Building 33 - How to mix SE4445 cartridges for storageThis page describes how to set up and mix SE4445 into smaller syringes for later use in the B33 cleanroom complex gowning area. | |
Building 33 - Setting up the equipment for gluingPage describing how to setup the air dispenser, PC, and robot for gluing. | |
Building 33 - Programming the glue robotPage describing how to set up points programme, | |
Loading documents & presentationsCopies of lab notes and documents as well as links to relevant presentations |
Integration Pages
Building 33 - Operating the QC Test BoxProcedures for operating the CO2 Plant and test box equipment |
Thermal TestDescription and details on thermal test procedures. |
Readout and Q/C setups
FELIX readoutFELIX readout system documentations, direct FELIX setups, and test configurations. |
---|
Cooling Unit for Module QCInformation on cooling unit for module QC |
---|
YARR ReadoutYARR test bench documentation |
---|
RCE ReadoutRCE test bench documentation |
---|
Module PSU Specs: https://docs.google.com/spreadsheets/d/1__SXNmNmi92uIiTc3N6NaWk_F7qjPgREDWn6JAHsI6M/edit#gid=1364552063