Inner Pixel: Loading, integration, and testing

Table of Contents
indent20

Quick access resources for module loading & integration

p19-0 Prototypes


Loading and integration prototypes

Thermomechanical prototypes

p19-0

: Coupled ring & L0 stave

p19-0

  • Dummy Heaters information including drawings, dimensions, soldering procedures, and testing

Ring loading [Tubes Up] [Tubes Down] [gDoc with loading notes for each side]

Stave loading [p19-0 stave anatomy]

Electrical prototypes: Coupled ring, 2x L1 stave, L0 stave 

p19-1

Ring loading [gDoc]

Links for the 4 AUW presentations, ATLAS Digest link

Integration prototype

Parts expected to begin arriving at SLAC in July 2021

p19-2

Module loading pages

Building 33: Module loading equipment


Building 33: Operating procedures  


Further documentation and resources 

Datasets

Tables of wet and dry dispensing datasets collected after October 2020

Related presentations  

Contains copies of lab notes and documents in addition to links for relevant presentations between August 2018 and February 2020

Module mounting glue options

Obsolete loading tooling 


Integration Pages

Image Added

Image Added

Image Modified

Image Modified

Q/C Box Electrical/Readout Setup 

Electrical and readout setup description, connectivity and collection of component design links. 

B33-CO2 Plant Approved Procedure

CO2-plant equipment information, approved procedures and hazard

B33 - Operating the QC Test Box    

Procedures for operating the CO2 Plant and test box equipment

Thermal Test

Description and details on thermal test procedures.


Readout and Q/C setups  

B84-network.pngImage Modified


Image Modified

Image Modified

Image Added

Image Modified

ITk pixel DAQ readout infrastructure and network at SLAC.

This page requires ATLAS-confluence-editor permission

RCE Readout

RCE test bench documentation for SLAC ITk local setups.

More general RCE readout documentations on CERN Twiki RCEDevelopmentLab

YARR Readout

YARR test bench documentations.

FELIX Readout


Felix readout documentation for the Felix712

Direct  FELIX readout

FELIX readout system documentations, direct FELIX setups, and test configurations.

Image Added

Image Added

Image Added

Image Added

Optoboard/Optobox/Optopanel

Electrical-Optical data transmission conversion system 


Link Aggregator system

ATCA system to support larger number of Rd53 readout

DAQ Web GUI

General DAQ operation GUI interface and instructions common to all DAQ platforms

Xilinx IBERT Tool

The xilinx IBERT test is analternative solution for the traditional chipscope eye-diagra

Image Modified

Image Modified

Image Added

Image Modified

Image Modified

Module Q/C & Reception Test Portal

Module general info. Test spec and infrastructure. Module inventory.

Cooling Unit for Module QC

Information on cooling unit for module QC 

ITkPixV1 readout

a readout chain includes ITkPixV1 chip, GBCRv2, VLDB+, and DAQ

DCS control/monitoring

Information on infrastructure and instructions for LV/HV PSU control and monitoring 

DCS Interlock

Interlock setup for Lab and B33 integration


Some useful links:

1) simple User Guide for the ATCA Shelf Manager

Manuals:
1) RD53a user manual
2) RD53B user manual
3) GBCR design and testing
4) DAQ with FELIX+Optoboard+YARR by Ismet (links to documentation within!)