This page centralizes documentation relating to the module loading, integration, and quality control/assurance testing of the Inner System, part of ATLAS' Inner Tracker Pixels Phase II upgrade project.


Calendar of the personnel on site

Link google calendar doc


Noprint

Table of Contents

Expand

Inner Pixel: Loading, integration, and testing

Table of Contents
indent20

Quick access resources for module loading & integration

p19-0 Prototypes


Loading and integration prototypes

Thermomechanical prototypes

p19-0

: Coupled ring & L0 stave

p19-0

  • Dummy Heaters information including drawings, dimensions, soldering procedures, and testing

Ring loading [Tubes Up] [Tubes Down] [gDoc with loading notes for each side]

Stave loading [p19-0 stave anatomy]

Electrical prototypes: Coupled ring, 2x L1 stave, L0 stave 

p19-1Parts expected to begin arriving at SLAC in July 2021

Ring loading [gDoc]

Links for the 4 AUW presentations, ATLAS Digest link

Integration prototype

p19-2

Module loading pages

Building 33: Module loading equipment


Building 33: Operating procedures  


Further documentation and resources 

Datasets

Tables of wet and dry dispensing datasets collected after October 2020

Related presentations  

Contains copies of lab notes and documents in addition to links for relevant presentations between August 2018 and February 2020

Module mounting glue options

Integration Pages

Image Removed

Image Removed

Image Removed

B33-CO2 Plant Approved Procedure

CO2-plant equipment information, approved procedures and hazard

B33 - Operating the QC Test Box    

Procedures for operating the CO2 Plant and test box equipment

Thermal Test

Description and details on thermal test procedures.

Readout and Q/C setups  

B84-network.pngImage Removed

Image Removed

Image Removed

Image Removed

Image Removed

ITk pixel DAQ readout infrastructure and network at SLAC.

This page requires ATLAS-confluence-editor permission

RCE Readout

RCE test bench documentation for SLAC ITk local setups.

More general RCE readout documentations on CERN Twiki RCEDevelopmentLab

YARR Readout

YARR test bench documentations.

FELIX readout

FELIX readout system documentations, direct FELIX setups, and test configurations.

DAQ Web GUI

General DAQ operation GUI interface and instructions common to all DAQ platforms

Image Removed

Image Removed

Image Removed

Image Removed

Module Q/C Portal

Module general info. Test spec and infrastructure. Module inventory.

Cooling Unit for Module QC

Information on cooling unit for module QC 

DCS control/monitoring

Information on infrastructure and instructions for LV/HV PSU control and monitoring 

DCS Interlock

Interlock setup for Lab and B33 integration

This page centralizes documentation relating to the module loading, integration, and quality control/assurance testing of the Inner System, part of ATLAS' Inner Tracker Pixels Phase II upgrade project.

Calendar of the personnel on site

Link google calendar doc

Noprint

Table of Contents

Expand

Inner Pixel: Loading, integration, and testing

Table of Contents
indent20

Quick access resources for module loading & integration

p19-0 Prototypes

p19-0: Coupled ring & L0 stave

Ring loading [Tubes Up] [Tubes Down]

Stave loading [p19-0 stave anatomy]

p19-1

Parts expected to begin arriving at SLAC in July 2021

p19-2

Module loading pages

Building 33: Module loading equipment

Obsolete loading tooling 

  • 19-0 style 
    • Temporary quad & triplet pick up plates for thermomechanical prototype's loading tooling

  • Consumable components for mixing and dispensing SE4445

    • A list of consumables required for mixing SE4445, storing it in syringes, and dispensing it with the Janome robot.

    • The linked page includes the information required to place orders for each item.

  • Glue dispensing equipment

    • Page describing the air dispenser, PC, and Janome robot for glue dispensing. The page labels the equipment. The operations instructions are obsolete. Please follow the latest instructions here.

    • In addition, we now have an edge finder we can mount on the robot. 
  • Quad & triplet pick up plates 
  • Equipment manuals 

  • Datasheets 

  • Building 33: Operating procedures  

      • Lexar loading bridge 
      • Stave loading tooling (baseplate + loading bridge + pick up plate) 
      • Ring loading tooling (di-quad bridge & pick up plate, triplet bridge & pick up plate, baseplate) 

    Integration Pages

    Image Added

    Image Added

    Image Added

    Image Added

    Further documentation and resources 

    Datasets

    Tables of wet and dry dispensing datasets collected after October 2020

    Related presentations  

    Contains copies of lab notes and documents in addition to links for relevant presentations between August 2018 and February 2020

    Module mounting glue options

    Integration Pages

    Image Removed

    Image Removed

    Image Removed

    Q/C Box Electrical/Readout Setup 

    Electrical and readout setup description, connectivity and collection of component design links. 

    B33-CO2 Plant Approved Procedure

    CO2-plant equipment information, approved procedures and hazard

    B33 - Operating the QC Test Box    

    Procedures for operating the CO2 Plant and test box equipment

    Thermal Test

    Description and details on thermal test procedures.


    Readout and Q/C setups  

    B84-network.pngImage Modified


    Image Modified

    Image Modified

    Image Added

    Image Modified

    Image Removed

    ITk pixel DAQ readout infrastructure and network at SLAC.

    This page requires ATLAS-confluence-editor permission

    RCE Readout

    RCE test bench documentation for SLAC ITk local setups.

    More general RCE readout documentations on CERN Twiki RCEDevelopmentLab

    YARR Readout

    YARR test bench documentations.

    FELIX Readout


    Felix readout documentation for the Felix712

    Direct  FELIX readout

    FELIX readout system documentations, direct FELIX setups, and test configurations.

    Image Added

    Image Added

    Image Added

    Image Added

    Optoboard/Optobox/Optopanel

    Electrical-Optical data transmission conversion system 


    Link Aggregator system

    ATCA system to support larger number of Rd53 readout

    DAQ Web GUI

    General DAQ operation GUI interface and instructions common to all DAQ platforms

    Xilinx IBERT Tool

    The xilinx IBERT test is analternative solution for the traditional chipscope eye-diagra

    Image Modified

    Image Modified

    Image Added

    Image Modified

    Image Modified

    Module Q/C & Reception Test Portal

    Module general info. Test spec and infrastructure. Module inventory.

    Cooling Unit for Module QC

    Information on cooling unit for module QC 

    ITkPixV1 readout

    a readout chain includes ITkPixV1 chip, GBCRv2, VLDB+, and DAQ

    DCS control/monitoring

    Information on infrastructure and instructions for LV/HV PSU control and monitoring 

    DCS Interlock

    Interlock setup for Lab and B33 integration


    Some useful links:

    1) simple User Guide for the ATCA Shelf Manager

    2) ITk construction Google Drive 

    3) Module Reception microscope image collection on Google Drive  

    Manuals:
    1) RD53a user manual
    2) RD53B user manual
    3) GBCR design and testing
    4) DAQ with FELIX+Optoboard+YARR by Ismet (links to documentation within!)