Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

This page centralizes documentation relating to the module loading, integration, and quality control/assurance testing of the Inner System, part of ATLAS' Inner Tracker Pixels Phase II upgrade project.


Calendar of the personnel on site

Link google calendar doc


Noprint

Table of Contents

Expand

Inner Pixel: Loading, integration, and testing

Table of Contents
indent20

Quick access resources for module loading & integration


Loading and integration prototypes

Thermomechanical prototypes: Coupled ring & L0 stave

p19-0

  • Dummy Heaters information including drawings, dimensions, soldering procedures, and testing

Ring loading [Tubes Up] [Tubes Down] [gDoc with loading notes for each side]

Stave loading [p19-0 stave anatomy]

Electrical prototypes: Coupled ring, 2x L1 stave, L0 stave 

p19-1

Ring loading [gDoc]

Links for the 4 AUW presentations, ATLAS Digest link

Integration prototype

p19-2

Module loading pages

Building 33: Module loading equipment

Image Removed

Image Removed
Janome robot
    • Janome robot for glue dispensing. The page labels the equipment. The operations instructions are obsolete.

 Please follow the
    •  Please follow the latest instructions here.

    • In addition, we now have an edge finder we can mount on the robot. 

Image Removed

Quad & triplet pick up plates 

  • CMM measurements from October 23 & 29, 2020; February 25, 2021
    View file
    namePickup Plates w- grooves.pdf
    height250
View file
nameREF-000112056 RD53a Ring_Triplet top view only.pdf
height150
view-file
namesome dimensions from PF-256-102-70.pdf
height150
View file
nameview of PF-256-102-30 PICK UP PLATE SGL-TPL with 20mm slides.pdf
height150
View file
nameview of PF-256-102-30 PICK UP PLATE SGL-TPL with 22mm slides.pdf
height150


Building 33: Operating procedures  

Image Removed

smaller 
    • smaller  syringes for later use in the B33 cleanroom complex gowning area.
Image Removed
Image Removed: Programming in
    • for the Janome Points
for the glue dispensing robot
    • software 
      • We can only predict so many eventualities: This page describes how to create your own custom Janome Points program file. It breaks down some key concepts (like Janome jargon "Point Job," "PTP," and "palette") as well as how to set up the Janome Points programme.
  • Running the CMM

    • Describes how to operate the CMM in the small clean room in B33 
  • Rework procedure

    • Using fishing line and ethanol, we can remove heaters from staves. [Confluence]
  • SE4445 Glue Layer Analysis


Analyzing glue dispensing performance 

Coverage

Glue layer thickness

PurposeDetermine the area of the glue layer beneath a module as a percentage of the module areaDetermine the thickness of the layer of glue underneath the module Target range75-85%75-125 microns (ATLAS specification: 100+100 -50 microns)Measurement strategy 

Extract glue layer area from images collected of samples on a clean, solid, high-contrast background.

Please note that a ruler or other clearly known dimension must be in the image frame to provide a pixel-real world coordinates calibration source.

Height gauge measurements Analysis resources

Charlie created a MATLAB script for measuring coverage in images of dispensed samples collected on a clean white background.

Alternatively, we can extract these areas with image processing tools like ImageJ.

Hannah and Rachel prepared Python-based scripts to analyze csv files containing height gauge measurement results. The (messy) scripts are available on GitLab: https://gitlab.cern.ch/hherde/slacpixelsanalysis

Further documentation and resources 

Datasets

Tables of wet and dry dispensing datasets collected after October 2020

Related presentations  

Contains copies of lab notes and documents in addition to links for relevant presentations between August 2018 and February 2020

Module mounting glue options

Obsolete loading tooling 


Integration Pages

Image Added

Image Added

Image Modified

 Building 33

Image Added

Q/C Box Electrical/Readout Setup 

Electrical and readout setup description, connectivity and collection of component design links. 

B33-CO2 Plant Approved Procedure

CO2-plant equipment information, approved procedures and hazard

B33 - Operating the QC Test Box    

Procedures for operating the CO2 Plant and test box equipment

Thermal Test pages

Image Removed

Thermal Test

Description and details on thermal test procedures.


Readout and Q/C setups  

B84-network.pngImage Added


Image Added

Image Added

Image Added

Image Added

ITk pixel DAQ readout infrastructure and network at SLAC.

This page requires ATLAS-confluence-editor permission

Image Removed

FELIX readout

FELIX readout system documentations, direct FELIX setups, and test configurations.

Image Removed

YARR Readout

YARR test bench documentations.

ZCU102_FMCImage Removed

RCE Readout

RCE test bench documentation for SLAC ITk local setups.

More general RCE readout documentations

are hosted

on CERN Twiki RCEDevelopmentLab

YARR Readout

YARR test bench documentations.

FELIX Readout


Felix readout documentation for the Felix712

Direct  FELIX readout

FELIX readout system documentations, direct FELIX setups, and test configurations.

Image Added

Image Added

Image Added

Image Added

Optoboard/Optobox/Optopanel

Electrical-Optical data transmission conversion system 


Link Aggregator system

ATCA system to support larger number of Rd53 readout

DAQ Web GUI

General DAQ operation GUI interface and instructions common to all DAQ platforms

Xilinx IBERT Tool

The xilinx IBERT test is analternative solution for the traditional chipscope eye-diagra

Image Added

Image Modified

Image Added

Image Added

Image Added

Module Q/C & Reception Test Portal

Module general info. Test spec and infrastructure. Module inventory.

Cooling Unit for Module QC

Information on cooling unit for module QC 

Image Removed

LV/HV PSU

ITkPixV1 readout

a readout chain includes ITkPixV1 chip, GBCRv2, VLDB+, and DAQ

DCS control/monitoring

Information on infrastructure and instructions for LV/HV PSU control and monitoring 

DCS Interlock

Interlock setup for Lab and B33 integration


Some useful links:

1) simple User Guide for the ATCA Shelf Manager

2) ITk construction Google Drive 

3) Module Reception microscope image collection on Google Drive  

Manuals:
1) RD53a user manual
2) RD53B user manual
3) GBCR design and testing
4) DAQ with FELIX+Optoboard+YARR by Ismet (links to documentation within!)