This page centralizes documentation relating to the module loading, integration, and quality control/assurance testing of the Inner System, part of ATLAS' Inner Tracker Pixels Phase II upgrade project.

Module loading pages

Building 33: Module loading equipment


Mixing SE4445


Module loading procedures 



Repeat purchases for gluing

A list of equipment needed to mix SE4445 syringes and use in
Janome robot.

Building 33 - Glue freezer monitoring setup  

Page describing the setup of the LabJack 7 + thermocouples,

as well as monitoring software, PC setup, network setup.

 Building 33 - How to mix SE4445 cartridges for storage

 This page describes how to set up and mix SE4445 into smaller syringes for later use in the B33 cleanroom complex gowning area.

Building 33 - Setting up the equipment for gluing

Page describing how to setup the air dispenser, PC, and

robot for gluing.


Building 33 - Programming the glue robot

Page describing how to set  up points programme,
what is the difference between Point Job, PTP, palette plus example with glue.

Loading documents & presentations

Copies of lab notes and documents as well as links to relevant presentations




Integration Pages

 Building 33 - Operating the QC Test Box  

Procedures for operating the CO2 Plant and test box equipment

Quality Control & Assurance (QA/QC)

Thermal Test pages

Thermal Test

Description and details on thermal test procedures.


Readout and Q/C setups 

FELIX readout

FELIX readout system documentations, direct FELIX setups, and test configurations.

Cooling Unit for Module QC

Information on cooling unit for module QC 

YARR Readout

YARR test bench documentation

ZCU_FMC.bmp

RCE Readout

RCE test bench documentation

Module PSU Specs: https://docs.google.com/spreadsheets/d/1__SXNmNmi92uIiTc3N6NaWk_F7qjPgREDWn6JAHsI6M/edit#gid=1364552063