You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 157 Next »

This is the home page for the Beam Test 2006 space. This page can be edited by anyone with GLAST confluence permission, and is meant to replace, the old beam test web page, which can be found here.

Beam Test 2006  : Operations

This is dedicated to the control room activities

General:                           Message Board  3PM Meetings Calendar  Meeting minutes     Phone Numbers  Who is on Shift?

Data Taking:                    Configurations  Instructions for Shifts   What is in the Control Room  Elogbook    Shift Log 

Online:                              Env. Monitoring  Run Control   Online Monitoring  Ancillary Detectors

Monitoring:                       CU  Environmental   AD   Local Offline  Data Monitoring  Pipeline

Trigger and DAQ:             PS Computer Network  Trigger Logic Hardware CU Trigger

PS Ancillary Detectors:   SSD Chambers  Scintillators  Calorimeter

Instrument Procedures:  Safety  HV Turn-On  Support Table

PS Procedures:                Safety  Access to T9  Change Magnet Settings

SPS Procedures:              Safety  Access to H4

Drawings:                        PS Setup  CU/ISC  

Beam Test 2006: Data Analysis

This is the for data analysis mostly

General:                        Forum  Presentations CCB BT   VRVS  Workshop 3  Workshop 2  Workshop 1

Data Access                  Get Data  Get MC Data  Status of Priority Runs  Summary of Run Types

Data Taking Info:         Shift Log Table Positions Table DescriptionRelevant Run Info

Data Analysis Topics:   MMS Background PSF    Other CAL parameters

Data Analysis Info:       BT Workbook Calibrations

Offline Software:         Known Bugs    BT Pipeline  Local Offline  BT Geometry  Pipeline errors Offline Monitor

  • No labels