You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 108 Next »

Beam Test 2006  : Operations

This is the home page for the Beam Test 2006 space. This page can be edited by anyone with GLAST confluence permission, and is meant to replace, the old beam test web page, which can be found here.

General:                          Message Board     Daily Schedule    Phone Numbers  3pm meeting calendar

Data Taking:                   Instructions for Shifts   What is in the Control Room   Who is on Shift?   Shift Log  Expert List

Data Access                     Runs Database SPS Data Taking

Online:                             Env. Monitoring  Run Control   Online Monitoring  Ancillary Detectors

Monitoring:                       CU  Environmental   AD   Local Offline  Data Monitoring  Pipeline

Trigger and DAQ:             PS Network   Hardware Trigger

PS Ancillary Detectors:   SSD Chambers  Scintillators  Calorimeter

Instrument Procedures:  Safety  Turn-on High Voltage  Support Table

PS Procedures:                Safety  Access to T9  Change Magnet Settings

SPS Procedures:              Safety  Access to H4

Beam Test 2006: Data Analysis

This is the for data analysis mostly

General:                          Forum  Presentations

Meetings:                        VRVS  Workshop 3  Workshop 2  Workshop 1

Data Taking:                    Shift Log 

Data Access                     Runs Database  SPS Data Taking

Data Analysis:                 BT WorkbookCalibrations  Micrometeorite Shield Backgroung

Offline Software:             Known Bugs  MC Simulated Runs  BT Pipeline  Local Offline  BT Geometry

  • No labels