This is the home page for the Beam Test 2006 space. This page can be edited by anyone with GLAST confluence permission, and is meant to replace, the old beam test web page, which can be found here.
Beam Test 2006 : Operations
This is dedicated to the control room activities
General: Message Board 3 pm Meetings Phone Numbers
Data Taking: Instructions for Shifts What is in the Control Room Elogbook Who is on Shift? Shift Log
Online: Env. Monitoring Run Control Online Monitoring Ancillary Detectors
Monitoring: CU Environmental AD Local Offline Data Monitoring Pipeline
Trigger and DAQ: PS Computer Network Hardware Trigger
PS Ancillary Detectors: SSD Chambers Scintillators Calorimeter
Instrument Procedures: Safety Turn-on High Voltage Support Table
PS Procedures: Safety Access to T9 Change Magnet Settings
SPS Procedures: Safety Access to H4
Drawings: PS Setup CU/ISC
Beam Test 2006: Data Analysis
This is the for data analysis mostly