This page centralizes documentation relating to the module loading, integration, and quality control/assurance testing of the Inner System, part of ATLAS' Inner Tracker Pixels Phase II upgrade project.
Calendar of the personnel on site
Table of Contents
|
Ring loading [Tubes Up] [Tubes Down]
Parts expected to begin arriving at SLAC in July 2021
A list of consumables required for mixing SE4445, storing it in syringes, and dispensing it with the Janome robot.
The linked page includes the information required to place orders for each item.
Page describing the air dispenser, PC, and Janome robot for glue dispensing. The page labels the equipment. The operations instructions are obsolete. Please follow the latest instructions here.
Page describing the setup of the LabJack 7 + thermocouples, as well as monitoring software, PC setup, network setup.
Datasets | Tables of wet and dry dispensing datasets collected after October 2020 |
---|---|
Related presentations | Contains copies of lab notes and documents in addition to links for relevant presentations between August 2018 and February 2020 |
Module mounting glue options |
|
B33 - Operating the QC Test BoxProcedures for operating the CO2 Plant and test box equipment | Thermal TestDescription and details on thermal test procedures. |
Discussion on Stavelet strategy [Confluence, 2019-08-21]
2019 requirements for the design and instrumentation in the SLAC test box [Confluence]
ITk pixel DAQ readout infrastructure and network at SLAC. This page requires ATLAS-confluence-editor permission | RCE ReadoutRCE test bench documentation for SLAC ITk local setups. More general RCE readout documentations on CERN Twiki RCEDevelopmentLab | YARR ReadoutYARR test bench documentations. | FELIX readoutFELIX readout system documentations, direct FELIX setups, and test configurations. |
Module Q/C PortalModule general info. Test spec and infrastructure. Module inventory. | Cooling Unit for Module QCInformation on cooling unit for module QC | DCS control/monitoringInformation on infrastructure and instructions for LV/HV PSU control and monitoring | DCS InterlockInterlock setup for Lab and B33 integration |