Module ID | Stereo (Half-Module ID) | Axial (Half-Module ID) | Assembled | Surveyed | Goodness (stereo/axial) | Mounted | Assignment |
---|---|---|---|---|---|---|---|
1 | L0M22 | 04/24/19 (CB) | 04/25/19 (MS) | ok/ok (CB) | 04/25/19 (TKN) | L0 top | |
2 | L0M16 | L0M17 | 04/24/19 (CB) | 04/25/19 (MS) | ok/ok (CB) | 04/25/19 (TKN) | L0 bot |
3 | L0M07 | 04/24/19 (CB) | 04/25/19 (MS) | ok/ok (CB) | 04/26/19 (CB) | L1 top | |
5 | L0M15 | L0M03 | 04/24/19 (CB) | 04/25/19 (MS) | ok/ok (CB) | 04/26/19 (CB) | L1 bot |
6 | L0M09 | L0M20 | 04/26/19 (CB) | Spare |
Module ID | Stereo (Half-Module ID) | Axial (Half-Module ID) | 2014 Goodness (stereo/axial) | Retested | Goodness (stereo/axial) | Mounted | Assignment |
---|---|---|---|---|---|---|---|
0 | 24 | 9 | Bad channels in 2 APVs furthest from beam | Couldn't communicate with APV | |||
1 | 26 | 28 | Perfect | 20190415 (CB) | Perfect/Perfect | B3 | |
2 | 23 | 25 | Perfect | 20190415 (CB) | Perfect/Bad channels in second APV furthest from the beam | Spare | |
3 | 5 | 8 | Perfect | 20190329 (OM) | Bad channels in APV farthest from the beam /Perfect | T2 | |
4 | 16 | 1 | Perfect | 20190329 (OM) | Perfect/Couldn't communicate with an APV | ||
5 | 2 | 13 | Bad channels in APV furthest from beam | 20190415 (CB) | Several bad channels on APV farthest from the beam | Spare | |
6 | 22 | 29 | Perfect/Bad channel in APV furthest from beam | 20190329 (OM) | Perfect/Bad channel in APV furthest from the beam | T3 | |
7 | 14 | 21 | Bad channels in 2 APVs furthest from beam; Bad hinge fit, drilled out and sanded to fit | 20190410 (OM) | Bad channels in APV closest to the beam/Bad channels in second APV furthest from the beam | ||
8 | 7 | 3 | Bad channels in APV furthest from beam | 20190410 (OM) | Bad channels in APV furthest from the beam/Bad channel in APV furthest from the beam | B2 | |
9 | 15 | 19 | Weird noise shape/Bad channel in APV furthest from beam (warm runs only) | 20190410 (OM) | Weird noise vs channel distribution. Response looks fine (from 2014 runs)./Bad channel in APV furthest from beam | Spare |
Module ID | Stereo (Half-Module ID) | Axial (Half-Module ID) | 2014 Goodness | Re-Tested | Goodness (stereo/axial) | Re-Mounted | Assignment |
---|---|---|---|---|---|---|---|
0 | 4 | 19 | bad channels in middle APVs | 5/10/19 (CB) | good/A hybrid flaky | ||
7 | 15 | 14 | bad channels in APV furthest from beam/perfect | 5/10/19 (CB) | good/good | yes | 6B |
8 | 1 | 13 | bad channels on both edges/bad channels in 2 APVs furthest from beam | 5/10/19 (CB) | good/B hybrid flaky sync | ||
3 | 9 | 4 | perfect | yes | 6T | ||
1 | 5 | 6 | perfect | untouched | 4B | ||
2 | 7 | 8 | perfect | untouched | 5B | ||
4 | 2 | 3 | perfect | untouched | 4T | ||
5 | 10 | 11 | perfect | untouched | 5T |
Module 3 was removed from 6B and the module 0 stereo half-module was mounted to module 3 axial by Tim in the hps alcove. Module 3 was not re-tested before going into 6T.