Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migrated to Confluence 4.0

This is the home page for the Beam Test 2006 space. This page can be edited by anyone with GLAST confluence permission, and is meant to replace, the old beam test web page, which can be found here.

Beam Test 2006  :

...

This is dedicated to the control room activities

General:                           Message Board  3PM Meetings Calendar  Meeting minutes     Phone Numbers  Weekly Shift-list: (PS: 1-2 3 4) Schedule 

                                         SPS Shift Table

                                         What to do before arriving at CERN Dates of presence at CERN

Data Taking:                    Configurations  Instructions for Shifts   What is in the Control Room  Elogbook    Shift Log   Shifters list

                                        Offline Monitor Instructions  Offline Monitor Logbook  Offline Monitor

...

Operations

CERN Operations    GSI Operations    SLAC Operations    CU Hand-off memo

Beam Test 2006: Data Analysis

This is the for data analysis mostly

Meetings:            

...

 

...

 

...

 

...

Offline :                           Data Monitoring  Pipeline Runs Digest FASTCopy

PS Trigger and DAQ:             Computer Network   Trigger Logic  CU Trigger

PS Ancillary Detectors:   SSD Chambers  Scintillators  Calorimeter Cerenkov

SPS Trigger and DAQ: External Trigger Logic

SPS Ancillary Detecors: He Threshold Cherenkov  N2 Threshold Chrenkov

Instrument Procedures:  Safety  HV Turn-On  Support Table

PS Procedures:                Accelerator elogbookSafety  Access to T9  Beam and Magnet Settings

SPS Procedures:              Safety  Access to H4 SPS eLogBook  H4 Manual SPS live (explanation)

Drawings:                       T9 SetUp  CU/ISC-OSC  

Beam Test 2006: Data Analysis

...

  Weekly VRVS meetings  F2F Meeting   Workshop4 (Workshop4 agenda)  Workshop 3  Workshop 2  Workshop 1

General:                       Movies  Forum  Presentations CCB BT

...

Pictures More pictures

Data Access                  Get Data  Get MC Data  Status of Priority Runs  Summary of Run Types Summary Plots of Configurations List Of Good Runs

Data Taking Info:         Shift Log   Paper logbook pdf ,html PS final schedule Table Positions  Table Description  Relevant Run Info  PS+SPS+GSI shift logs 

Data Analysis Topics:   List of Analysis Topics    BT Geometry     BT Workbook   

How to use:                   Event Display   Merit tuple   BT tuple   CAL Tuple  Calibration

...