...
Beam Test 2006 : Operations (CERN emergency number 74444)
This is dedicated to the control room activities
General: Message Board 3PM Meetings Calendar Meeting minutes Phone Numbers Weekly Shift-list: (PS: 1-2 3 4) Schedule
SPS Shift Table
What to do before arriving at CERN Dates of presence at CERN
Data Taking: BT configurations Instructions for Shifts What is in the Control Room Elogbook Shift Log Shifters list
Offline Monitor Instructions Offline Monitor Logbook Offline Monitor Geometrical configurations (SPS) FIFO Configurations
Online: Elogbook Env. Monitoring Running Run Control Online Monitoring Ancillary Detectors Tagger alignment/synch Tagger calibration
Offline : Data Monitoring Pipeline Runs Digest FASTCopy
PS Trigger and DAQ: Computer Network Trigger Logic CU Trigger
PS Ancillary Detectors: SSD Chambers Scintillators Calorimeter Cerenkov
SPS Trigger and DAQ: External Trigger Logic
SPS Ancillary Detectors: He Threshold Cherenkov N2 Threshold Cherenkov
Instrument Procedures: Safety HV Turn-On Support Table
PS Procedures: Accelerator elogbookSafety Access to T9 Beam and Magnet Settings
SPS Procedures: Safety Access to H4 SPS eLogBook H4 Manual SPS live (explanation)
...
CERN Operations
Beam Test 2006: Data Analysis
...