Alignment procedure and parameters

Description of the detector geometry and alignment procedure can be found in
CSPAD Geometry and Alignment.

CSPAD alignment history

2015-03-04 quad alignment is done for cxig0715-r0023, archived in geometry/1-end.data
(tick) Deployed:  /reg/data/ana04/cxi/cxif5315/calib/CsPad::CalibV1/CxiDs2.0:Cspad.0/geometry/1-end.data (cables are swapped)
(warning) quad index-swapped for swapped-cable geometry file is deployed for cxi86415:  /reg/d/psdm/CXI/cxi86415/calib/CsPad::CalibV1/CxiDs2.0:Cspad.0/geometry/1-end.data (and renamed to 0-end.data)
2015-05-01 quad alignment is done for cxii2415, deployed as /reg/d/psdm/CXI/cxii2415/calib/CsPad::CalibV1/CxiDs1.0:Cspad.0/geometry/1-end.data
and corrected for quad=0 for cxii5615, deployed as /reg/d/psdm/CXI/cxii5615/calib/CsPad::CalibV1/CxiDs1.0:Cspad.0/geometry/1-end.data

Known detectors

on 2014-07-04:

           CxiDs1.0:Cspad.0
           CxiDs2.0:Cspad.0
           CxiDsd.0:Cspad.0
           MecTargetChamber.0:Cspad.0
           SxrBeamline.0:Cspad.1
           XcsEndstation.0:Cspad.0
           XppGon.0:Cspad.0

References