  1. PingER web services: ?
    1. PingER & AMP Integration (AMP/NLANR has run out of funding, AMP will shut down 8/31/06. Given the demise of AMP this may need to be changed to integration with PerfSONAR): Asif
      1. Document work with AMP integration (hope to complete 11/18/06): Abdullah
      2. Extend to provide perfSONAR data reading front end: Abdullah, Asif
      3. Install & integrate code at SLAC: Abdullah
      4. Working on password protection: Abdullah
      5. Improve code, make production quality, automate getting data (requested with suggestions 8/20/06, making progress hope to be done in 3-4 days 8/31/06, sent back to SLAC, SLAC responded further formatting etc. improvements needed 9/12/06, we need to either fnish this up or say Abdullah is not going to do it 3/20/07, Abdullah agreed to complete and send 3/22/07, Abdullah sent code but it needs indenting and some example documentation mail sent to Abdullah 4/4/07): Abdullah
      6. Get account (has this been done 11/29/06?): Abdullah
      7. Integrate with pingtable.pl: Abdullah, Jerrod
        1. Create AMP file directory: Jerrod
        2. Set up daily crontab:  Jerrod
        3. Set up analyze-hourly etc: (Done)Jerrod
        4. Add src & dst amp nodes to Guthrie: Jerrod
        5. Think about retrieving older data (find out how long ago there is data for): Jerrod, Adnan
        6. AMP and Pinger data comparison: Abdullah
    2. Smokeping & PingER Integration: Asma, Asif (took over from Shahryar , Shahryar will provide Asif information of current status)
      1. Install at SLAC: AsifShahryar
        1. Make code available via FTP then Shahryar will download: Asma, Shahryar
        2. Install on test www server (Does not work): Shahryar, Asif, Les
        3. Review code for security and update as neeeded (Shahryar has done and waits Asma updates 2/1/07, need to shift from flora to iepm-resp, she has been told and she has access): Les, Shahryar, Asma
      2. Change from 90 to 120 days - Asma
      3. Look at adding visualization of uptime: Asma
      4. Look at how to dynamically change the config file for Smokeping to accomodate the step interval (maybe time consuming, may affect all users and be cumbersome): Asma
      5. Look at using Smokeping to determine the quality of home links in Pakistan: Asma
      6. Will use as a top level access to PingER and also as links from Pingtable to display last 45-90 days using smokeping: Asma, Yee
    3. Provide real time access to cached data
      1. Do for SLAC
        1. Decide on how to extend to other monitoring sites, try with NIIT: Akbar, Umer
        2. Hassan is looking into the code sent by Fawad (next step is to get ML web services client to get data): Akbar, Hassan
    4. Ping-data.pl form only shows beacons.
      1. Wiki Markup
        -Document in FAQ \[Done 2/20/07\]: Les-
      2. Need to point $sites_fn to pinger.xml instead of beacons.txt & check if the file is xml or flat (for backward compatibility): Shahryar
      3. Added item to FAQ to cover: Les
    5. Monitoring Hosts:
      1. NTC hosts, they agreed to install PingER2 at their 3 backbone sites (NTC management has changed, NIIT shifted from NTC to PERN, does not look promising): Arshad, Azher
      2. Pakistan hosts
        1. Wiki Markup
          -NTC is down since Oct 17th (-{_}{-}NTC management has changed, Arshad will contact upper management 12/4/06{-}{_}{_}-)-_ -\[After talking to NTC does not sound likely this will be restored, 1/11/07\]: Azher, Jerrod-
        2. PERN does not ping and reverse traceroute server is down (need to decide whether to give up on this host and remove it from our list of hosts to use for PingER and TULIP, awaits presentation to PERN/NTC, presentation to PERN made by Les 3/15/07, they are agreeable, need to move forward, Azher is working the issue with Anwar 3/29/07): Azher
        3. PERN would like to provide own archive analysis host (Les has sent URL describing tools needed on archive/analysis host, it maybe that iepm-bw would be more useful to them, however installing iepm-bw is non-trivial, or revive the real time PingER plots):

...

  1. Deployment: Faran
    1. Look into Mathematics of Singular Vector Decomposition technique. (agreed 11/16/06): Faran
  2. Improve web page
    1. Wiki Markup
      -Should the tables at NIIT web site be able to re-size themselves horizontally \[The images do not work right in this case\]: Faran-
  3. Visualization
    1. Wiki Markup
      -Make tables sortable (working on 5/25/06, re-agreed 8/3/06, re-requested 8/21/06, done for the RTTs 8/22/06, can we do with buttons for all columns, agreed 2/27/07) \[Done 3/22/07\]: Faran-
    2. Provide documentation (in progress 2/27/07, documented maths of selection 3/20/07, needs updating, agreed to update 3/22/07): Farhan, Faran
    3. Can we add AS's to routes: Yee, Faran
    4. DiscoveryStatistics =>LandMark Analysis one gets SLAC with RTT 0.0 regardless (reported 3/20/07): Faran
    5. Wiki Markup
      -If ping fails in Looking Glass Sites it shows as \-5.0 RTT, should show as NAN (agreed 3/5/07, re-reported 3/20/07) \[Done 3/22/07\]: Faran-
    6. When one double clicks on a row in Ping Results and the ping fails (e.g. host not responding) nothing shows in the  pop-up window. I think some diagnostic  or something should show (reported 3/20/07): Faran
    7. % complete location window needs information to say pings done but traceroutes still in progress (reported 3/20/07): Faran
    8. Add diagnostic to Sites.txt to identify bad formatting: Faran
    9. When zooming maintain size of dots (should we use Google maps, keep as a wish list item 2/27/07):  Faran
  4. Evaluate whether using traceroute data helps (Suggested by Umar & Les 2/26/07): Faran
  5. Landmarks
    1. Get more lanmarks landmarks for TULIP:
      1. China (sent email to ctsnet 7/26/06, reminded 12/6/06, 1/27/07): Les
      2. Try and get sites in Africa (Les sent email 11/28/06): Les
      3. COMTEC, Japan (Faran send email reminder 5/25/06, agreed to send another reminder 6/7/06, Umar will check with Farooq 11/16/06): Faran, Farooq
      4. Add traceroute/Looking Glass servers in critical areas, if they have a common format (asked for 11/15/06, Les did a manual look at traceroute.org and found about 20 potential landmarks 11/17/06, Faran not clear if one can automate 2/27/07, several are automateable, to prove it Les has added 8, Faran will work on, re-requested 3/26/07 with suggestions): Faran
      5. Get site in Korea (made contact, test case works, suggest case study on S.E. Asia): Umar
    2. Add NetDiGi route servers (asked for 8/30/06, is able to parse them, will look at adding appropriate hosts 3/22/07): Faran
    3. Brunsvigia appears not to accept names, need to modify TULIP to call with addresses (requested fix to TULIP 3/26/07, sent email to S. Africa with what is broken 3/26/07): Faran
  6. Apply to PingER node database to check the lat/longs are roughly correct (tried with 300-400 sites but cannnot get results due to fragile Internet at NIIT, will interact with Akbar to make tests at SLAC 8/31/06, exchanged emails on list of PingER hosts to locate 9/3/06): Faran
  7. Analysis
    1. Literature search on triangulation, multi-lateration: Faran
    2. Wiki Markup
      -Measure landmarks from landmarks \[Done 2/15/07\]: Faran-
    3. Optimize alpha by landmark (after have new location algorithm working, will try 1:2 for US, 1:3 for Europe, 2:15 Africa) : Faran
    4. Document Faran's algorithm, try new algorithm that does not require destination to be inside triangle: Faran, Umar
    5. Analyse the effect of passing IP addresses to landmarks rather than names: Faran
    6. Look at impact of increasing number of pings for getting accurate min_RTT : Faran
    7. Compare with GeoIP Tools
    8. (Faran measured for a few sites, Les gave ideas on how to extend and analyze for multiple sites, could be a major project 4/4/07): Faran
    9. Compare with GeoIP Tools
    10. For US For US compare Faran's algorithm with Octant (no longer available 2/27/07), GeoIP & simple triangulation for PingER hosts(in progress 2/1/07)
      1. Confidence estimates
      2. Applied to PingER hosts
      3. Outside triangles, area coverage
      4. Effect/need to vary alpha: Faran
      5. Look at big discrepancies
  8. Analysis of Accuracy and applicability
    1. Accuracy vs known locations (landmarks & PingER hosts): faran
    2. Effect of removing, adding landmarks, try for Bolivia: Faran
    3. Provide bubble maps of accuracy: Faran
    4. What area/population is covered by TULIP
    5. Document anomalies  (e.g. root-servers): Faran
    6. Show accuracy by region and country: Faran
    7. Come up with a way to estimate the accuracy/confidence of estimates: Faran
      1. Document in the TULIP web page: Faran
  9. Find out more about GeoIP Tools
    1. Wiki Markup
      -Faran make contact with GeoIP people \[Done 3/20/07\]: Faran-
    2. Wiki Markup
      Find a case where TULIP beats GeoIP Tool \[Done 4.68.116.16\]:

...

  1. Wiki Markup
    -Get video conferencing working echo cancelling mike is very helpful, NIIT does not appear to need one, if so Brooks has sent details 3/21/07 \[Done 3/21/07\]: Azher, Adnan, Les, Brooks-
  2. Projects (see http://www-iepm.slac.stanford.edu/pinger/projects/)
  3. Paper on event diagnosis (curent status, will hear results 2nd week April for SJC): Adnan
  4. Proposals
    1. Wiki Markup
      -HEC solicitation for International collaborations, due mid-Sept, Farooq PI (submitted 9/17/06, expect result Dec '06) \[Our proposal was rejected Jan 07\]-
    2. Get reviews of proposal (done for US, trying Pak thru Atta): Arshad, Les
    3. Submit proposal to HEC (due 2/2/07): Arshad, Umar
    4. Develop new proposal with more a Grid Health viewpoint (Cisco raised issues, await resolution 3/22/07): Yee, Arshad, Les, Cisco
    5. Proposal for perfSONAR (shown to Atta 3/15/07)
      1. Write up (working on Outline,  hope for draft weeken 3/24/07_we have draft, need to review 4/4/07): Umar

Wiki

  1. Create space for NIIT student reports and populate with initial reports - Yee, Les
  2. Wiki Markup
    -Umar has set one up at NIIT and it works OK \[Done 4/4/07\]: Umar-