COllection of proposed data taking configurations
Summary plan
Collection of proposed data taking configurations
Photons - total estimated time 90hrs
part |
CU config |
time |
status |
note |
schedule |
---|---|---|---|---|---|
2.5 full-brem |
twr3 0 deg |
5 |
done |
|
|
tagged full-spectrum |
twr3 0 deg |
12.5 |
2.5 gev primary done |
interrupted after 2.5gev becasue of low beam rate today |
|
tagged full-spectrum |
twr3 30 deg in the crack |
12.5 |
|
do 2.5,1,0.5,1.5 might reduce to 2.5 and 1 (5 hrs) if needed |
|
tagged full-spectrum |
twr3 30 deg reduced path length |
12.5 |
|
" |
|
tagged full-spectrum |
twr3 10 deg |
12.5 |
|
" |
|
tagged full-spectrum |
twr3 20 deg |
12.5 |
|
" |
|
2.5 full brem |
albedo 2 (145 deg just above cal, from steve) |
5 |
|
|
|
tagger low-energy setup calibration |
|
8 |
|
|
|
tagger low-energy |
twr3 0 deg |
5 |
|
|
|
tagger low-energy |
twr3 conf 1 |
5 |
|
|
|
Electron runs
part |
energy |
CU conf |
estimated time |
schedule |
purpose |
---|---|---|---|---|---|
e |
5 |
many |
8 |
17/8 swing |
e scan |
e |
5 |
24 |
3 |
|
twr 1 cross-range calibration |
Proton runs
part |
energy |
CU conf |
estimated time |
schedule |
---|---|---|---|---|
|
|
|
|
|
|
|
|
|
|
Special runs
CAL FHE study : check DAV-MeV conversion, efficiency
Detailed plan
part |
energy |
CU conf |
estimated time |
schedule |
---|---|---|---|---|
c1 |
C2 |
c3 |
c4 |
c5 |
Photons
Note: take 25k evts runs for tagged photons
part |
beam en |
CU position |
BT |
AD sync |
statistics |
schedule |
---|---|---|---|---|---|---|
tagged ph |
2.5 |
0 deg twr 3 |
1 |
yes |
100K |
owl 18 |
tagged ph |
2.5 |
x=374.5,y=0,z=-132,angle=30 |
1 |
yes |
100K |
owl 18 |
tagged ph |
2.5 |
x=525,y=0,z=-48,angle=30 |
1 |
yes |
100K |
owl 18 |
tagged ph |
2.5 |
x=561,y=0,z=-48,angle=10 |
1 |
yes |
100K |
owl 18 |
tagged ph |
2.5 |
x=500,y=0,z=-48,angle=20 |
1 |
yes |
100K |
day 18 |
tagged ph |
1 |
0 deg twr 3 |
1 |
yes |
100K |
day 18 |
tagged ph |
1 |
x=374.5,y=0,z=-132,angle=30 |
1 |
yes |
100K |
day 18 |
tagged ph |
1 |
x=525,y=0,z=-48,angle=30 |
1 |
yes |
100K |
day 18 |
tagged ph |
1 |
x=561,y=0,z=-48,angle=10 |
1 |
yes |
100K |
swing 18 |
tagged ph |
1 |
x=500,y=0,z=-48,angle=20 |
1 |
yes |
100K |
swing 18 |
tagged ph |
1.5 |
0 deg twr 3 |
1 |
yes |
100K |
swing 18 |
tagged ph |
1.5 |
x=374.5,y=0,z=-132,angle=30 |
1 |
yes |
100K |
swing 18 |
tagged ph |
1.5 |
x=525,y=0,z=-48,angle=30 |
1 |
yes |
100K |
owl 19 |
tagged ph |
1.5 |
x=561,y=0,z=-48,angle=10 |
1 |
yes |
100K |
owl 19 |
tagged ph |
1.5 |
x=500,y=0,z=-48,angle=20 |
1 |
yes |
100K |
owl 19 |
tagged ph |
0.5 |
0 deg twr 3 |
1 |
yes |
150K |
owl 19 |
tagged ph |
0.5 |
x=374.5,y=0,z=-132,angle=30 |
1 |
yes |
150K |
day 19 |
tagged ph |
0.5 |
x=525,y=0,z=-48,angle=30 |
1 |
yes |
150K |
day 19 |
tagged ph |
0.5 |
x=561,y=0,z=-48,angle=10 |
1 |
yes |
150K |
swing 19 |
tagged ph |
0.5 |
x=500,y=0,z=-48,angle=20 |
1 |
yes |
150K |
swing 19 |
full brem |
2.5 |
just above cal,angle=145 |
1 |
no |
2M |
owl 20 |
beam energy |
CU position and impact point |
CU configuration |
tagged |
statistics |
estimated time (hrs) |
purpose |
status |
---|---|---|---|---|---|---|---|
2.5 |
0 degrees through twr3 |
BT1 |
no (full-brem) |
2M |
5 (overnight) |
PSF for flight tower |
DONE |
2.5 |
" |
" |
yes |
100K |
2.5 |
PSF+Erecon for flight tower |
DONE |
1.5 |
" |
" |
yes |
100k |
2.5 |
" |
|
1 |
" |
" |
yes |
100K |
2.5 |
" |
|
0.5 |
" |
" |
yes |
150k |
4 |
" |
|
2.5 |
twr3 30 deg in the crack |
" |
yes |
100k |
2.5 |
PSF+Erecon tower dependence |
|
1.5 |
" |
" |
yes |
100k |
2.5 |
" |
|
1 |
" |
" |
yes |
100k |
2.5 |
" |
|
0.5 |
" |
" |
yes |
150k |
4 |
" |
|
2.5 |
twr3 30 deg reduced path length |
||||||
1.5 |
" |
|
|
|
|
|
|
1 |
" |
" |
yes |
100k |
2.5 |
Erecon |
|
0.5 |
" |
" |
yes |
150K |
4 |
Erecon |
|
2.5 |
10deg tower 3 |
" |
yes |
100K |
2.5 |
Erecon |
|
1.5 |
" |
" |
" |
" |
" |
" |
|
1 |
" |
" |
" |
" |
" |
" |
|
0.5 |
" |
" |
" |
" |
" |
" |
|
2.5 |
20deg tower 3 |
" |
" |
" |
" |
" |
|
1.5 |
" |
" |
" |
" |
" |
" |
|
1 |
" |
" |
" |
" |
" |
" |
|
0.5 |
" |
" |
" |
" |
" |
" |
|
0.5 |
tagger calibration for 100mev gammas |
|
|
|
8 |
move tagger, improve resolution for 500mev primary beam |
|
0.5 |
0 degrees through twr3 |
|
|
150K |
5 |
PSF+Erecon for flight tower for 100mev well-tagged gammas |
|
0.5 |
30 degrees impact twr3 through twr2 |
|
|
150K |
5 |
PSF+Erecon for flight tower for 100mev well-tagged gammas |
|
0.5 |
20 degrees, impact on twr3 through twr2, impact point 1 |
|
|
150K |
5 |
PSF+Erecon for flight tower for 100mev well-tagged gammas |
|
Electron for CAL calibration - total estimated time 3hrs
beam energy |
CU position and impact point |
CU configuration |
tagged |
statistics |
estimated time (hrs) |
purpose |
---|---|---|---|---|---|---|
5 |
0 degrees through twr1, 12 positions x 2(XY) |
BT16 (4rng, NZS,ext trigger) |
NA |
10k per 12 pos |
3 |
scan logs for intercalibration, verify if need to redo calibrations after pile-up rejection |
CAL FHE study : check DAV-MeV conversion, efficiency
+++ BT-17 to BT-21 configurations
+ electrons, 0 degree, 5GeV/c, tower 3,
FHE=500MeV-750MeV-1000MeV-1500MeV-2000MeV
+ electrons, 45 degree, 5GeV/c, tower 3,
FHE=500MeV-750MeV-1000MeV-1500MeV-2000MeV
Proton runs
2. study pedestal drift vs rate:
p at 10 GeV setting LAT threshold to 5 DAC - repeat
Pile-up verification runs
Setup a random trigger and take couple of quick runs (20k evts) in random trigger to directly measure pile-up events - setup should be done in paralle