COllection of proposed data taking configurations
Summary plan
Collection of proposed data taking configurations
Photons - total estimated time 90hrs
see shift list for detailed program and settings
part |
CU config |
time |
status |
note |
---|---|---|---|---|
2.5 full-brem |
twr3 0 deg |
5 |
done |
|
tagged full-spectrum |
twr3 0 deg |
12.5 |
2.5 gev primary done |
interrupted after 2.5gev becasue of low beam rate today |
tagged full-spectrum |
twr3 30 deg in the crack |
12.5 |
|
do 2.5,1,0.5,1.5 might reduce to 2.5 and 1 (5 hrs) if needed |
tagged full-spectrum |
twr3 30 deg reduced path length |
12.5 |
|
" |
tagged full-spectrum |
twr3 10 deg |
12.5 |
|
" |
tagged full-spectrum |
twr3 20 deg |
12.5 |
|
" |
2.5 full brem |
albedo 2 (145 deg just above cal, from steve) |
5 |
|
|
tagger low-energy setup calibration |
|
8 |
|
|
tagger low-energy |
twr3 0 deg |
5 |
|
|
tagger low-energy |
twr3 conf 1 |
5 |
|
|
Electron runs
see shift list for detailed program and settings
part |
energy |
CU conf |
estimated time |
schedule |
purpose |
---|---|---|---|---|---|
e |
5 |
many |
8 |
17/8 swing |
e scan |
e |
5 |
24 |
3 |
|
twr 1 cross-range calibration |
Positron runs
setup trigger scintillators before MMS target
take 1M e+ and 1M e-
Proton runs
2. study pedestal drift vs rate:
p at 10 GeV setting LAT threshold to 5 DAC - repeat
Special runs
CAL FHE study : check DAV-MeV conversion, efficiency
+++ BT-17 to BT-21 configurations
+ electrons, 0 degree, 5GeV/c, tower 3,
FHE=500MeV-750MeV-1000MeV-1500MeV-2000MeV
+ electrons, 45 degree, 5GeV/c, tower 3,
FHE=500MeV-750MeV-1000MeV-1500MeV-2000MeV
Pile-up verification runs
Setup a random trigger and take couple of quick runs (20k evts) in random trigger to directly measure pile-up events;
Electron for CAL calibration - total estimated time 3hrs
beam energy |
CU position and impact point |
CU configuration |
tagged |
statistics |
estimated time (hrs) |
purpose |
---|---|---|---|---|---|---|
5 |
0 degrees through twr1, 12 positions x 2(XY) |
BT16 (4rng, NZS,ext trigger) |
NA |
10k per 12 pos |
3 |
scan logs for intercalibration, verify if need to redo calibrations after pile-up rejection |