COllection of proposed data taking configurations

Summary plan

Collection of proposed data taking configurations

 Photons - total estimated time 90hrs

see shift list for detailed program and settings 

part 

CU config

time

status

 note

 2.5 full-brem

twr3 0 deg

5

done

 

 tagged full-spectrum

twr3 0 deg

12.5

 2.5 gev primary done

  interrupted after 2.5gev becasue of low beam rate today

 tagged full-spectrum

twr3 30 deg in the crack

12.5

 

do 2.5,1,0.5,1.5 might reduce to 2.5 and 1 (5 hrs) if needed

 tagged full-spectrum

twr3 30 deg reduced path length

12.5 

 

 "

 tagged full-spectrum

 twr3 10 deg

12.5

 

 "

 tagged full-spectrum

twr3 20 deg

12.5 

 

 "

 2.5 full brem

albedo 2 (145 deg just above cal, from steve)

 

 

 tagger low-energy setup calibration

 

8

 

 

 tagger low-energy

twr3 0 deg

 5

 

 

 tagger low-energy

twr3 conf 1

 5

 

 

 Electron runs

see shift list for detailed program and settings 

part 

 energy

CU conf 

estimated time 

 schedule

purpose 

 e

 5

 many

 8

 17/8 swing

 e scan

 e

 5

 24

 3

 

 twr 1 cross-range calibration

Positron runs

setup trigger scintillators before MMS target

take 1M e+ and 1M e-

Proton runs

2. study pedestal drift vs rate:

p at 10 GeV setting LAT threshold to 5 DAC - repeat

Special runs

CAL FHE study : check DAV-MeV conversion, efficiency
+++ BT-17 to BT-21 configurations
+ electrons, 0 degree, 5GeV/c, tower 3,
FHE=500MeV-750MeV-1000MeV-1500MeV-2000MeV
+ electrons, 45 degree, 5GeV/c, tower 3,
FHE=500MeV-750MeV-1000MeV-1500MeV-2000MeV

Pile-up verification runs

Setup a random trigger and take couple of quick runs (20k evts) in random trigger to directly measure pile-up events;

 Electron for CAL calibration - total estimated time 3hrs

 beam energy

CU position and impact point

 CU configuration

tagged

statistics 

estimated time (hrs) 

purpose 

  5 

 0 degrees through twr1, 12 positions x 2(XY)

 BT16 (4rng, NZS,ext trigger)

NA

10k per 12 pos

3

scan logs for intercalibration, verify if need to redo calibrations after pile-up rejection