Photons program

swing16 + owl17 + day17  

 part

 E

table position

BT

 trigger

AD sync

statistics 

 magnet

estimated time (hrs) 

note 

purpose 

 

 

 

 

 

 

 

 

 

 

 pedestal run for tagger

 

 

 

 

 

 

 

 

 

 

 move CU to center of twr 3 (see below)

 e

2.5

  0 degrees through twr3 (x=607,y=45,z=0,angle=0)

 BT1

 S0&S2&C1&C2&NoSh&NoS3

  yes

 10K

 0

 -

 check position of beam wrt CU


 e

 2.5

 "

 BT1

   S0&S2&C1&C2&NoSh&NoS3

 NO

 100k

 0

-

   measure beam properties

 

 e

 2.5

"

  BT1 

 S0&S2&S4&C1&C2&NoSh&NoS3

 yes

100K

 600A

 2.5

set slits at 51.5 - check that rate on S0 is 5K part/spill
take 25k runs

 PSF+Erecon for flight tower

 e

 1.5

"

 "

  S0&S2&S4&C1&C2&NoSh&NoS3

 yes

100k

 360A

 2.5

 "

 "

 e

 1

"

 "

  S0&S2&S4&C1&C2&NoSh&NoS3

 yes

100K

 240A

 2.5

 "

 "

 e

 0.5

"

 "

  S0&S2&S4&C1&C2&NoSh&NoS3

 yes

200k 

 120A

 4

 "

 "

 e

 2.5

"

 

  S0&S2&C1&C2&NoSh&NoS3

 no (full-brem)

 2M

 600A

 5

take 100k runs.
start no later than 3AM, if necessary postpone previous runs to the next day. If finished before 8AM just proceed and take data until 8AM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  • No labels