COllection of proposed data taking configurations
discussion 17-8
COllection of proposed data taking configurations
Photons - total estimated time
part |
CU config |
time |
status |
note |
schedule |
---|---|---|---|---|---|
2.5 full-brem |
twr3 0 deg |
5 |
done |
|
|
tagged full-spectrum |
twr3 0 deg |
12.5 |
2.5 gev primary done |
low beam rate today |
|
tagged full-spectrum |
twr3 30 deg in the crack |
12.5 |
|
do 2.5,1,0.5,1.5 might reduce to 2.5 and 1 (5 hrs) if needed |
|
tagged full-spectrum |
twr3 30 deg reduced path length |
12.5 |
|
" |
|
tagged full-spectrum |
twr3 10 deg |
12.5 |
|
" |
|
tagged full-spectrum |
twr3 20 deg |
12.5 |
|
" |
|
2.5 full brem |
albedo 2 (145 deg just above cal, from steve) |
5 |
|
|
|
tagger low-energy setup calibration |
|
8 |
|
|
|
tagger low-energy |
twr3 0 deg |
5 |
|
|
|
tagger low-energy |
twr3 conf 1 |
|
|
|
|
beam energy |
CU position and impact point |
CU configuration |
tagged |
statistics |
estimated time (hrs) |
purpose |
---|---|---|---|---|---|---|
2.5 |
0 degrees through twr3 |
BT1 |
no (full-brem) |
2M |
5 (overnight) |
PSF for flight tower |
2.5 |
" |
" |
yes |
100K |
2.5 |
PSF+Erecon for flight tower |
1.5 |
" |
" |
yes |
100k |
2.5 |
" |
1 |
" |
" |
yes |
100K |
2.5 |
" |
0.5 |
" |
" |
yes |
150k |
4 |
" |
2.5 |
30 degrees impact twr3 through twr2 |
" |
yes |
100k |
2.5 |
PSF+Erecon tower dependence |
1.5 |
" |
" |
yes |
100k |
2.5 |
" |
1 |
" |
" |
yes |
100k |
2.5 |
" |
0.5 |
" |
" |
yes |
150k |
4 |
" |
1 |
20 degrees, impact on twr3 through twr2, impact point 1 |
" |
yes |
100k |
2.5 |
Erecon |
1 |
20 degrees, impact on twr3 through twr2, impact point 2 |
" |
yes |
100k |
2.5 |
" |
0.5 |
tagger calibration for 100mev gammas |
|
|
|
8 |
move tagger, improve resolution for 500mev primary beam |
0.5 |
0 degrees through twr3 |
|
|
150K |
5 |
PSF+Erecon for flight tower for 100mev well-tagged gammas |
0.5 |
30 degrees impact twr3 through twr2 |
|
|
150K |
5 |
PSF+Erecon for flight tower for 100mev well-tagged gammas |
0.5 |
20 degrees, impact on twr3 through twr2, impact point 1 |
|
|
150K |
5 |
PSF+Erecon for flight tower for 100mev well-tagged gammas |
Electron for CAL calibration - total estimated time 3hrs
beam energy |
CU position and impact point |
CU configuration |
tagged |
statistics |
estimated time (hrs) |
purpose |
---|---|---|---|---|---|---|
5 |
0 degrees through twr1, 12 positions x 2(XY) |
BT16 (4rng, NZS,ext trigger) |
NA |
10k per 12 pos |
3 |
scan logs for intercalibration, verify if need to redo calibrations after pile-up rejection |
CAL FHE study : check DAV-MeV conversion, efficiency
+++ BT-17 to BT-21 configurations
+ electrons, 0 degree, 5GeV/c, tower 3,
FHE=500MeV-750MeV-1000MeV-1500MeV-2000MeV
+ electrons, 45 degree, 5GeV/c, tower 3,
FHE=500MeV-750MeV-1000MeV-1500MeV-2000MeV
Proton runs
1. study nuclear interactions : shape in CAL and TKR, Mip Finder, check MC
+++ BT-1 configuration
+ proton, 0 degree, 10-6 GeV/c, tower 3
+ proton, 60 degrees, 10-6 GeV/c, tower 3
2. study pedestal drift vs rate:
p at 10 GeV setting LAT threshold to 5 DAC
3. p run with muon settings to check standard ground calibration with CR with real MIPs
Pile-up verification runs
Setup a random trigger and take couple of quick runs (20k evts) in random trigger to directly measure pile-up events - setup should be done in parallel
discussion 16-8
Photons - total estimated time 56h
beam energy |
CU position and impact point |
CU configuration |
tagged |
statistics |
estimated time (hrs) |
purpose |
---|---|---|---|---|---|---|
2.5 |
0 degrees through twr3 |
BT1 |
no (full-brem) |
2M |
5 (overnight) |
PSF for flight tower |
2.5 |
" |
" |
yes |
100K |
2.5 |
PSF+Erecon for flight tower |
1.5 |
" |
" |
yes |
100k |
2.5 |
" |
1 |
" |
" |
yes |
100K |
2.5 |
" |
0.5 |
" |
" |
yes |
150k |
4 |
" |
2.5 |
30 degrees impact twr3 through twr2 |
" |
yes |
100k |
2.5 |
PSF+Erecon tower dependence |
1.5 |
" |
" |
yes |
100k |
2.5 |
" |
1 |
" |
" |
yes |
100k |
2.5 |
" |
0.5 |
" |
" |
yes |
150k |
4 |
" |
1 |
20 degrees, impact on twr3 through twr2, impact point 1 |
" |
yes |
100k |
2.5 |
Erecon |
1 |
20 degrees, impact on twr3 through twr2, impact point 2 |
" |
yes |
100k |
2.5 |
" |
0.5 |
tagger calibration for 100mev gammas |
|
|
|
8 |
move tagger, improve resolution for 500mev primary beam |
0.5 |
0 degrees through twr3 |
|
|
150K |
5 |
PSF+Erecon for flight tower for 100mev well-tagged gammas |
0.5 |
30 degrees impact twr3 through twr2 |
|
|
150K |
5 |
PSF+Erecon for flight tower for 100mev well-tagged gammas |
0.5 |
20 degrees, impact on twr3 through twr2, impact point 1 |
|
|
150K |
5 |
PSF+Erecon for flight tower for 100mev well-tagged gammas |
Electron for CAL calibration - total estimated time 3hrs
beam energy |
CU position and impact point |
CU configuration |
tagged |
statistics |
estimated time (hrs) |
purpose |
---|---|---|---|---|---|---|
5 |
0 degrees through twr1, 12 positions x 2(XY) |
BT16 (4rng, NZS,ext trigger) |
NA |
10k per 12 pos |
3 |
scan logs for intercalibration, verify if need to redo calibrations after pile-up rejection |
CAL FHE study : check DAV-MeV conversion, efficiency
+++ BT-17 to BT-21 configurations
+ electrons, 0 degree, 5GeV/c, tower 3,
FHE=500MeV-750MeV-1000MeV-1500MeV-2000MeV
+ electrons, 45 degree, 5GeV/c, tower 3,
FHE=500MeV-750MeV-1000MeV-1500MeV-2000MeV
Proton runs
1. study nuclear interactions : shape in CAL and TKR, Mip Finder, check MC
+++ BT-1 configuration
+ proton, 0 degree, 10-6 GeV/c, tower 3
+ proton, 60 degrees, 10-6 GeV/c, tower 3
2. study pedestal drift vs rate:
p at 10 GeV setting LAT threshold to 5 DAC
3. p run with muon settings to check standard ground calibration with CR with real MIPs
Pile-up verification runs
Setup a random trigger and take couple of quick runs (20k evts) in random trigger to directly measure pile-up events - setup should be done in parallel