Half-module 0 - THE GIMP

Hybrid 0

Sensor 1803

to fixture

lousy

with a prayer

mashed bonds

painfully

? test 1

4 chips bonded, and 4 are alive. 3 of them are both bonded and alive.

?

never

Module ?

 

Half-module 1

Hybrid 1

Sensor 568

2/23/12(TKN)

2/23/12(TKN)

2/23/12(AG)

2/27/12(FM)

2/29/12(FM)

2/28/12 test 1
2/29/12 test 2
3/4/12 test 3

OK
Baseline tests by PH show high noise in channel 81 - partial pinhole?

3/12/12(TKN)

?

Module ?

READY

Half-module 2

Hybrid 0t

Sensor 150

3/1/12(TKN)

3/1/12(TKN)

3/1/12(OM)

3/2/12(FM)

3/6/12(FM)

3/5/12 test 1
3/7/12 test 2
3/9/12 test 3
3/12/12 test 4
3/12/12 test 5
3/12/12 test 6

OK

3/14/12(PH)

?

Module ?

READY

Half-module 3

Hybrid 1t

Sensor 132

3/10/12(TKN)

3/10/12(TKN)

3/12/12(TKN)

3/12/12(FM)

3/13/12(FM)

3/13/12 test 1
3/14/12 (OM, VF) test 2
3/19/12 test 3
3/19/12 test 4
3/23/12 test 6

High noise? (To retest) Chan 625 unbonded, 627 dead.
High noise is only on run 2 - believed due to noisy electrical contact between CF and baseplate.

 

 

Module ?

Cont'ed on next line

Cont'ed No 3

 

 

 

 

 

 

Chan 625 fixed, 3/22/12(FM)

 

 

3/23/12 (PH)

?

Module ?

Needs ITT connector

Half-module 4

Hybrid 2t

Sensor 134

3/10/12(TKN)

3/10/12(TKN)

3/12/12(TKN)

3/14/12(FM)

3/14/12(FM)

3/16/12 (TC, VF) test 1
3/17/12 test 2

Channels 317, 319 shorted, rest is OK.

3/18/12 (VF)

?

Module ?

READY

Half-module 5

Hybrid 3t

Sensor 136

3/10/12(TKN)

3/10/12(TKN)

3/12/12(TKN)

3/14/12(FM)

3/14/12(FM)

3/19/12 (VF,OM) test 1
3/19/12 test 2
3/19/12 test 3
3/19/12 test 4
3/19/12 test 5
3/19/12 test 7

OK.

3/23/12(PH)

?

Module ?

Needs ITT connector

Half-module 6

Hybrid 7t

Sensor 138

3/18/12(TKN)

3/18/12(TKN)

3/19/12(TKN/VF)

3/21/12(FM) noticed scratch on Bias/Guard rings. But IV is OK up to 300V.

3/22/12(FM)

3/22/12 test 1
3/22/12 test 2

OK except channels 0 (no response), 134, 639 (noisy response). Channel 0 is bad b/c of the scratch that connects it with bias ring.

3/23/12(PH)

?

Module ?

READY

Half-module 7

Hybrid 10t

Sensor 140

3/18/12(TKN)

3/18/12(TKN)

3/19/12(TKN/VF)

3/21/12(FM)

3/22/12(FM)

3/23/12 test 1
3/23/12 test 2
3/23/12 test 3
3/23/12 test 4
3/23/12 test 5
3/23/12 test 6
3/23/12 test 7
3/23/12 test 8
3/23/12 test 9

OK

3/27/12(OM)

?

Module ?

READY

Half-module 8

Hybrid 11t

Sensor 141

3/18/12(TKN)

3/18/12(TKN)

3/19/12(TKN/VF)

3/21/12(FM)

3/21/12(FM)

3/23/12 test 1
3/26/12 test 2
3/26/12 test 3

OK

3/27/12(OM)

?

Module ?

READY

Half-module 9

Hybrid 4t

Sensor 142

3/20/12(TKN)

3/20/12(TKN)

3/21/12(DG)

3/23/12(FM)

3/23/12(FM)

3/26/12 test 1

Channel 466 has no response (as on hybrid), else OK.

3/27/12(OM)

?

Module ?

READY

Half-module 10

Hybrid 13t

Sensor 145

3/20/12(TKN)

3/20/12(TKN)

3/21/12(DG)

3/23/12(FM)

3/23/12(FM)

3/26/12 test 1
3/27/12 test 2
3/27/12 test 3
3/27/12 test 4
3/28/12 test 5
3/28/12 test 6

Channels 81 and 83 shorted? Else OK.
All channels are OK from test 3 on.

3/27/12(PH)

?

Module ?

PROCESSING

Half-module 11

Hybrid 14t

Sensor 146

3/20/12(TKN)

3/20/12(TKN)

3/21/12(DG)

3/23/12(FM)

3/23/12(FM)

3/26/12 test 1
3/27/12 test 2
3/27/12 test 3
3/28/12 test 4
3/28/12 test 5
3/28/12 test 6
3/28/12 test 7
3/28/12 test 8
3/28/12 test 9
3/28/12 test 10
3/28/12 test 11

Shorts between channels 262 and 264 as well as between channels 403 and 405; channel 183 dead and high noise on channel 184; else OK.
262-264 and 403-405 appear to have been fixed as of test 3.

3/27/12(PH)

?

Module ?

PROCESSING

Half-module 12

Hybrid 6t

Sensor 147

3/22/12(TKN)

3/22/12(TKN)

3/23/12(PH)

03/27/12(FM)

03/27/12(FM)

03/27/12(OM)test 1 test 2
3/29/12 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
3/30/12 28 29 30 31

Channel 345 dead (as on hybrid), else OK

3/31/12(OM)

?

Module ?

READY

Half-module 13

Hybrid 15t

Sensor 153

3/22/12(TKN)

3/22/12(TKN)

3/23/12(PH)

03/28/12(FM)

03/28/12(FM)

03/29/12(OM)test 1
3/30/12 test 2
3/30/12 test 3
3/30/12 test 4
3/30/12 test 5

OK

3/31/12(OM)

?

Module ?

READY

Half-module 14

Hybrid 16t

Sensor 155

3/22/12(TKN)

3/22/12(TKN)

3/23/12(PH)

03/28/12(FM)

03/28/12(FM)

3/29/12 (OM) test 1
3/30/12 test 2
3/30/12 test 3
3/30/12 test 4
3/30/12 test 5
3/30/12 test 6
3/30/12 test 7
3/30/12 test 8
04/01/12 (VF)

Pedestal shift on channel 147? Else OK.
Chan. 147 has long tails in the response. Others OK.

?

?

Module ?

PROCESSING

Half-module 15

Hybrid 17t

Sensor 156

3/23/12(TKN)

3/23/12(TKN)

3/26/12(AG,VF,JN)

03/29/12(FM)

03/29/12(FM)

03/29/12(OM)test 1
3/30/12test 2
3/30/12test 3
3/31/12test 4

APV0 and APV2 display a large spread in the noise, else OK
Noise looks normal on test 4

3/31/12(OM)

?

Module ?

READY

Half-module 16

Hybrid 18t

Sensor 157

3/23/12(TKN)

3/23/12(TKN)

3/26/12(AG,VF,JN)

03/29/12(FM)

03/29/12(FM)

03/29/12(OM) test 1
3/30/12test 2
03/31/12(VF)

OK

?

?

Module ?

PROCESSING

Half-module 17

Hybrid 19t

Sensor 159

3/23/12(TKN)

3/23/12(TKN)

3/26/12(AG,VF,JN)

03/29/12(FM)

03/29/12(FM)

3/30/12(OM) test 1

Channel 254 bad (as on hybrid), else OK.

3/31/12(OM)

?

Module ?

PROCESSING

Half-module 18

Hybrid 20t

Sensor 563

3/26/12(TKN)

3/26/12(TKN)

03/27/12(PH)

03/30/12(FM)

03/30/12(FM)

04/01/12 (VF) test 1

OK

?

?

Module ?

PROCESSING

Half-module 19

Hybrid 21t

Sensor 564

3/26/12(TKN)

3/26/12(TKN)

03/27/12(PH)

03/30/12(FM)

03/30/12(FM)

04/01/12 (VF) test 1

OK

?

?

Module ?

PROCESSING

Half-module 20

Hybrid 24t

Sensor 565

3/26/12(TKN)

3/26/12(TKN)

03/27/12(PH)

03/30/12(FM)

03/30/12(FM)

? test 1

?

?

?

Module ?

PROCESSING

Half-module 21

Hybrid 5t

Sensor 144

3/27/12(TKN)

3/27/12(TKN)

03/27/12(PH)

03/30/12(FM)

03/30/12(FM)

? test 1

?

?

?

Module ?

PROCESSING

Half-module 22

Hybrid 22t

Sensor 566

3/27/12(TKN)

3/27/12(TKN)

03/30/12(AG,VF)

?

?

? test 1

?

?

?

Module ?

PROCESSING

Half-module 23

Hybrid 23t

Sensor 567

3/27/12(TKN)

3/27/12(TKN)

03/30/12(AG,VF)

?

?

? test 1

?

?

?

Module ?

PROCESSING

Half-module 24

Hybrid 25t

Sensor 597

3/30/12 (TKN)

3/30/12 (TKN)

?

?

?

? test 1

?

?

?

Module ?

PROCESSING

Half-module 25

Hybrid 26t

Sensor 601

3/30/12 (TKN)

3/30/12 (TKN)

?

?

?

? test 1

?

?

?

Module ?

PROCESSING

Half-module 26

Hybrid 27t

Sensor 603

3/30/12 (TKN)

3/30/12 (TKN)

?

?

?

? test 1

?

?

?

Module ?

PROCESSING

To add a half-module, copy the line below into the table and fill in the ?s.

|[Half-module ?] | [Hybrid ?] | [Sensor ?] | ? | ? | ? | ? | ? | ? [test 1|Half-module ?, test 1]| ? | ? | ? |[Module ?]| PROCESSING |
Create page

Half-module Channel Mapping

Following the DAQ channel ordering and the sensor strip channel numbering the conversion between the two is summarized below.

hybrid-chip-numbering.png 

  • No labels