You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

Attendance:

Agenda/Notes:

  1. Overview of results:
    1. Noise performance with reduced ADC resolution;
    2. Uniform switching behaviour;
    3. Progres on verification;
    4. Any other results so far;
  2. Status of back pressure reduction and running at full rate;
  3. ePix-M running parameters (trigger rates, etc);
  4. Beamtime prep
    1. when to set up
    2. Adding an ePix100 as secondary I0?
  5. A.O.B.
  • No labels