Attendees:
-----
Action Items:
Description | Due date | Assignee | Task appears on |
---|---|---|---|
| 2024-07-11 MEC-U Project Controls and Data Systems Team Meetings | ||
| MEC-U Collective Team Meetings | ||
| MEC-U Collective Team Meetings | ||
| MEC-U Collective Team Meetings | ||
| Omar Quijano | 2023-02-21 MEC-U Project Controls and Data Systems Team Meetings | |
| Terzi, Ken | 2023-02-21 MEC-U Project Controls and Data Systems Team Meetings | |
| Jing Yin | 2023-02-07 MEC-U Project Controls and Data Systems Team Meetings | |
| Alex Wallace | 2022-4-5 MEC-U Project Controls and Data Systems Team Meeting |
Topics:
Agenda Item | |
---|---|
Jama Controlled Docs update | |
Timing Discussion |
Minutes:
Jama:
- Jama requirements can be grouped in a baseline version that can be considered controlled.
- Jama baselines capture single or groups of requirements and their specific version.
- Will ensure we can reference baselines without concern of dynamic change.
Action Items:
- Send out timing slides (Tyler, SLAC)
- Send Ken Terzi the rack space allocation for timing hardware (Jing, SLAC)
Determine proximity requirements relative to front end oscillator for high precision timing hardware and send to LLNL (?, SLAC)- Negotiate placement of hardware in which racks (all)
When ready to specify actual SP front end laser, purchase to SLAC’s input/output interface specs to ensure consistency with Gen 2 setup and signals (Reagan, LLNL)