Contents


Full recovery, from e.g. a CPU reboot or power outage

  1. Master source IOCs sioc-sys0-ms0[1..6] should be running
    1. See Troubleshooting
  2. Open the MS/PRL main display
    1. See Displays
  3. Ensure that the MO is locked
    1. See MOLocker
  4. Ensure that all power amps are at their target power levels
    1. Digital attenuators should be at their target attenuation
    2. All PVs should be in NO_ALARM state (no red alarms on any PVs)
  5. Ensure that PRL loops are locked
    1. ...