Attendees:
-----
Action Items:
Description | Due date | Assignee | Task appears on |
---|---|---|---|
| 2024-07-11 MEC-U Project Controls and Data Systems Team Meetings | ||
| MEC-U Collective Team Meetings | ||
| MEC-U Collective Team Meetings | ||
| MEC-U Collective Team Meetings | ||
| Omar Quijano | 2023-02-21 MEC-U Project Controls and Data Systems Team Meetings | |
| Terzi, Ken | 2023-02-21 MEC-U Project Controls and Data Systems Team Meetings | |
| Jing Yin | 2023-02-07 MEC-U Project Controls and Data Systems Team Meetings | |
| Alex Wallace | 2022-4-5 MEC-U Project Controls and Data Systems Team Meeting |
Topics:
Agenda Item | |
---|---|
Jama Controlled Docs update | |
Timing Discussion |
Minutes:
Jama:
- Jama requirements can be grouped in a baseline version that can be considered controlled.
- Jama baselines capture single or groups of requirements and their specific version.
- Will ensure we can reference baselines without concern of dynamic change.
Action Items:
- Send out timing slides (Tyler, SLAC)
- Send Ken Terzi the rack space allocation for timing hardware (Jing, SLAC)
- Determine proximity requirements relative to front end oscillator for high precision timing hardware and send to LLNL (?, SLAC)
- Negotiate placement of hardware in which racks (all)
- When ready to specify actual SP front end laser, purchase to SLAC’s input/output interface specs to ensure consistency with Gen 2 setup and signals (Reagan, LLNL)