  • Review of last meeting items

Notes

  • Outstanding controls questions
  • ICD
    • Still waiting on the universal ICD for Controls to the MECU Project
      • This is deriving from an ECS-LCLS Controls ICD (a general purpose ICD), which Alex Wallace developed for HE
        • There is an interface to safety systems in here 
    • The following are interface management ICD
    • In the end we have three ICD, two pertain to how the controls between SLAC experiment controls and respective laser systems are interfaced, one pertains to how controls in general works with the rest of the project.
      • LLE and LLNL of course interface as they need to within their own WBS.
  1. LLE - SLAC Controls
    1. Make sure to include a data system interface as necessary
  2. LLNL - SLAC Controls
    1. Make sure to include a data system interface as necessary
  3. Collective Controls - MECU Project
  • Requirements review underway for LCLS for motion and vacuum for HE
    • Look for these sets to be shared in the coming weeks
      • Alex Wallace share the motion and vacuum requirements reviews from Jama for MECU collective


Action items

Past meeting AI

DescriptionDue dateAssigneeTask appears on
  • Meeting time may change to Thursday at 1pm if it satisfies everyone's schedules. Conflict arose for Bruce (New LLE team member for 10am on Thursday).
2024-07-11 MEC-U Project Controls and Data Systems Team Meetings
  • Require concept for toggling power on/off to small motors (CosyLab contacted)
MEC-U Collective Team Meetings
  • Seeking existing SLAC solution for closed loop pointing stability loop (vision/motor)
MEC-U Collective Team Meetings
  • Require concept for toggling power on/off to GigE cameras (CosyLab contacted)
MEC-U Collective Team Meetings
Eric M GaltierNotes on Experimental Diagnostics
  • Omar Quijano To work on documenting SLAC's IT infrastructure design including hardware specs and key information.
Omar Quijano2023-02-21 MEC-U Project Controls and Data Systems Team Meetings
  • Terzi, Ken To adjust some items on the presentation then send out to the group and Omar. Mitchell Cabral Will upload this to the Sharepoint.
Terzi, Ken2023-02-21 MEC-U Project Controls and Data Systems Team Meetings
  • Jing Yin TPR Card Specification Stub (Specific question from Ken: Number of outputs for TTL? LVTTL or TTL? Both?)
Jing Yin2023-02-07 MEC-U Project Controls and Data Systems Team Meetings
  • AD, how ACR operates the machine using high-level applications (Matlab and Python), Alex Wallace ping Greg White, et al for someone to talk to the collective about it.
Alex Wallace2022-4-5 MEC-U Project Controls and Data Systems Team Meeting