Attendees:

-----

Action Items:

DescriptionDue dateAssigneeTask appears on
  • Meeting time may change to Thursday at 1pm if it satisfies everyone's schedules. Conflict arose for Bruce (New LLE team member for 10am on Thursday).
2024-07-11 MEC-U Project Controls and Data Systems Team Meetings
  • Require concept for toggling power on/off to small motors (CosyLab contacted)
MEC-U Collective Team Meetings
  • Seeking existing SLAC solution for closed loop pointing stability loop (vision/motor)
MEC-U Collective Team Meetings
  • Require concept for toggling power on/off to GigE cameras (CosyLab contacted)
MEC-U Collective Team Meetings
  • Omar Quijano To work on documenting SLAC's IT infrastructure design including hardware specs and key information.
Omar Quijano2023-02-21 MEC-U Project Controls and Data Systems Team Meetings
  • Terzi, Ken To adjust some items on the presentation then send out to the group and Omar. Mitchell Cabral Will upload this to the Sharepoint.
Terzi, Ken2023-02-21 MEC-U Project Controls and Data Systems Team Meetings
  • Jing Yin TPR Card Specification Stub (Specific question from Ken: Number of outputs for TTL? LVTTL or TTL? Both?)
Jing Yin2023-02-07 MEC-U Project Controls and Data Systems Team Meetings
  • AD, how ACR operates the machine using high-level applications (Matlab and Python), Alex Wallace ping Greg White, et al for someone to talk to the collective about it.
Alex Wallace2022-4-5 MEC-U Project Controls and Data Systems Team Meeting

Topics:


Agenda Item
Jama Controlled Docs update
Timing Discussion

Minutes:

Jama:

  • Jama requirements can be grouped in a baseline version that can be considered controlled. 
  • Jama baselines capture single or groups of requirements and their specific version. 
    • Will ensure we can reference baselines without concern of dynamic change. 

Action Items: 

  • Send out timing slides (Tyler, SLAC)
  • Send Ken Terzi the rack space allocation for timing hardware (Jing, SLAC)
  • Determine proximity requirements relative to front end oscillator for high precision timing hardware and send to LLNL (?, SLAC)
  • Negotiate placement of hardware in which racks (all)
  • When ready to specify actual SP front end laser, purchase to SLAC’s input/output interface specs to ensure consistency with Gen 2 setup and signals (Reagan, LLNL)