You are viewing an old version of this page. View the current version .
Compare with Current
View Page History
Version 1
Next »
Date 08 Mar 2022
Discussion Items Collect walk-ins Notes review Name proposal"The collective" ack. Barry LLE Visit planningTopics/ discussion requests for LLNL? ICD Discussion Next steps in requirements developmentReview conops for all parts of the collective, identify all signals and diagnostics that must and would be nice to include in the DAQ streamConsider:What kind of diagnostic data is required for the science mission and the operations needs? Need to determine space and rate constraints of the SLAC EPICS archiver system How the diagnostic data will be used in the science goals of the facility?This determines what really needs to be included in the DAQ and how synchronously it must be acquired. How the diagnostic data will be used in optimizing and maintaining laser system performanceCould the DAQ system be leveraged be used in this regard if the EPICS archiver won't be enough? Jana B. Thayer This information will help to define our control system infrastructure requirements Controls hardware volume and cable tray estimatesNeed to develop high-level estimates for all systems in the collective as the cavern dimensions and floorplans are being set right now. Requirements listsDebuted the new requirements list portal for Jama requirements capture This portal is being used by SLAC to capture requirements before they are programmed into Jama Action items
Past meeting AI