Integration sequence:

  • Loaded Modules on Rings
    • Welding, QC testing
  • Load Services into ¼-shell
    • Transfer ¼-shell to integration tooling
  • Load Rings into ¼-shell
    • Transfer Rings to integration tooling
    • Integrate Rings into ¼-shell
    • Welding, QC testing
  • Integrate two ¼-shells
    • QC testing
  • Package, ship 


19-0 1/4-shells in B33 cleanroom:


Past presentation: Integration Tooling and Plan at SLAC 8 Nov 2021.pptx


Next steps:

  • Prepare for 19-0 (Drafting - setup with dummy rings and linear slide)
  • Finalize design/drawings of tables