List of Travelers:
Number | Title and Link | Author | Date Modified |
---|---|---|---|
DOC-10000 | CO2 Plant - High Pressure Decay Test .docx | Brian Qiu | 8 July 2020 |
DOC-10001 | CO2 Plant - Evacuation and CO2 Filling Procedure .docx | Brian Qiu | 3 June 2020 |
DOC-10002 | CO2 Plant - Operation of the Julabo chiller .docx | Brian Qiu | 8 July 2020 |
DOC-10003 | CO2 Plant - Startup and Shut Down of the CO2 Plant .docx | Brian Qiu | 9 July 2020 |
DOC-10004 | Scott Newbry | 29 March 2021 | |
DOC-10005 | Scott Newbry | 29 March 2021 |
Notes:
See Thermal Tests (confluence page) for links and information on the studies done so far at SLAC for Thermal Testing (and related instrumentation).
===========================================================================================================================================================
QC Test Box XY Stages
16:14 PM May 21, 2021: UNDER DEVELOPMENT
This documents the set-up and the operation of the XY stages (one for the ring and the other for the stave) in the QC test box.
Contacts: Sanha Cheong (sanha@slac.stanford.edu), Zhi Zheng (zzheng@slac.stanford.edu)
Set-up Overview
The stages are powered OpenBuilds 24V DC power supplies inside the QC test box. They are also connected via USB to the iMac (running Ubuntu) next to the QC text box and can be controlled by `OpenBuilds CONTROL` software.
Operation & Calibration Procedures
Ring Stage
USB0, Left PS
X: + is down, - is up. steps / mm = 197.04
Y: + is in, - is out. steps / mm = 57.14
Interlocks: X = [-5.21mm, 263mm] Y = [-5.18mm, 410mm]