For the team to organise as they see fit to meet their needs
beam time scheduled for Run23
Labor Day weekend MFX
Plus a Science measurements at Rixs
Weekly_Thursday_Calibration_Meeting_Confluence_Page
Table 1. Beamtimes and what is intended to be evaluated.
Camera testing | Station Beam | Dates | Objective | Beamtime_Summary_Page (photos, scripts, and everyting...) | Run_summary |
ePixM | MFX (8.8 keV) | 15,16 April, 2024 | First ePixM beamtime, run the detector with different run/daq rates, CompTH_ePixM values, temps... | April_15th_first_Beamtime | Apr_15_16_2024.xlsx |
ePixM | MFX (11.05 keV) | 12 May, 2024 | Test the detector with soft X-ray fluorescence (Yttrium, Ag, Cu targets) . | ||
ePixM | MFX (11 keV) | 15 June, 2024 | Evaluate the crosstalk within ASIC and inter-ASICs with different masks, but the unit was died when replacing the mask. | June_15th_2024_Beamtime | June_15_2024.xlsx |
ePixM (RX0003) | MFX (9.8 keV) | 1 Sep, 2024 | Evaluate the crosstalk within ASIC and inter-ASICs with a new unit. | ||
ePixM (RX0003) | MFX () | 1 Oct, 2024 | Evaluate new register setting optimised for dynamic range, new modified mask, new temp... |
Beamtime Prep for Run23
Calibration meeting notes 07/18/2024
Beamtime Measurement Plan
Measurements_Plan_Apr_22_2024.xlsx
Measurements_Plan_May_12_2024.xlsx
Measurements_Plan_June_15_2024.xlsx
some_proposed_epixm_tests_20_jun_2024.docx
Measurements_Plan_Sep_01_2024.xlsx (Final)
ePixM ASICs & Hardware Design
ePixM & ePixHRM (TID-IC Documentation)
ePixM carrier boards initial tests (Xavier)
ePixM daq integration Page (Created by
Analysis topics:
- some high level summary/update of where we are on this issue?
- some high level summary/update of where we are on this issue?
- some high level summary/update of where we are on this issue
- some high level summary/update of where we are on this issue
- some high level summary/update of where we are on this issue
- the "to-be-explained" section
ASC soft X-ray from Y, Ag target collection
- Y, Ag L line (soft X-ray) data collection