  • Verify power off.
  • Install detector in Marietta.
  • Connect chiller, start flow.
  • Connect data fiber.
  • Connect gas line if applicable, start flow at 5l/m.

Power

  • Set known values on mpod.
  • Pin out cable according to diagram.
  • Turn off mpod.
  • Connect power cable to detector.
  • Set operating voltages on mpod.
  • Start DAQ and configure to begin idle.

...