You are viewing an old version of this page. View the current version.
Compare with Current
View Page History
Version 1
Next »
Prepare
- Verify power off.
- Install detector in Marietta.
- Connect chiller, start flow.
- Connect data fiber.
Power
- Set known values on mpod.
- Pin out cable according to diagram.
- Turn off mpod.
- Connect power cable to detector.
- Set operating voltages on mpod.
- Start DAQ and configure to begin idle.
Stabilize for 15 minutes
Record Voltage/Current/Temperature Values
Measure Pedestals
Collect Fluorescence Data
Direct Illumination w/Mini-X
Process Data
Update Traveller