You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

Prepare

  • Verify power off.
  • Install detector in Marietta.
  • Connect chiller, start flow.
  • Connect data fiber.
  • Connect gas line if applicable, start flow at 5l/m.

Power

  • Set known values on mpod.
  • Pin out cable according to diagram.
  • Turn off mpod.
  • Connect power cable to detector.
  • Set operating voltages on mpod.
  • Start DAQ and configure to begin idle.

Stabilize for 15 minutes

Record Voltage/Current/Temperature Values

Measure Pedestals

Collect Fluorescence Data

Direct Illumination w/Mini-X

Process Data

Update Traveller


  • No labels