LICOS Architectural diagram (pdf)
LICOS Script Overview (pdf) (From R. Baun)
LICOS Script Priorities (pdf) (From R. Baun)
LAT Level Test Matrix and other Systems Engineering goodies
LICOS Notes
- Observations and anomalies
- Usage and the mobile rack
- VSC Science Interface gotchas
- Testbed usage
- Dalek usage
- Test Scripts
- LATC Interface Notes
- AstroRT and LICOS
- V&V Setup on lat-hobbit4
- Reanalysing a run Online, e.g., when recovering from the "dropped datagram problem"
- Disabling and enabling the SSR
- Dumping command packets
- Port number assignments for users
- Redispatching runs to the pipeline
Open JIRA Issues
Release Notes
MOOT/MOOD work (Joanne):
ISOC Software, Dataflow Lab
Offline Data Delivery
Mobile Rack plan (password protected):
Observatory Integration Readiness
- Transferring files between the Bastion Host and the sskiw machines
- LICOS Processing of LAT-Related SC Housekeeping (pdf)