Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migrated to Confluence 4.0

COllection of proposed data taking configurations

Summary plan

Collection of proposed data taking configurations

 Photons

...

 beam energy

CU position and impact point

CU configuration 

tagged

statistics 

estimated time (hrs) 

purpose 

 2.5

 0 degrees through twr3

 BT1

 no (full-brem)

2M

5 (overnight)

PSF for flight tower

 2.5

"

 "

 yes

100K

 2.5

 PSF+Erecon for flight tower

 1.5

"

 "

 yes

100k

 2.5

 "

 1

"

 "

 yes

100K

 2.5

 "

 0.5

"

 "

 yes

150k 

 4

 "

 2.5

 30 degrees impact twr3 through twr2

 "

 yes

100k

 2.5

 PSF+Erecon tower dependence

 1.5

"

 "

 yes

100k

 2.5

 "

 1

 "

 "

 yes

 100k

 2.5

 "

 0.5

 "

 "

 yes

 150k

 4

 "

 1

20 degrees, impact on twr3 through twr2, impact point 1

 "

yes

100k

2.5

Erecon

 1

20 degrees, impact on twr3 through twr2, impact point 2

 "

 yes

100k

2.5

 

 Electron for CAL calibration

 beam energy

CU position and impact point

 CU configuration

tagged

statistics 

estimated time (hrs) 

purpose 

  5 

 0 degrees through twr1, 12 positions ?

 BT? (4rng, NZS)

NA

2M

5 (overnight)

scan logs for intercalibration

 

 

1. study nuclear interactions : shape in CAL and TKR, Mip Finder, check MC
+++ BT-1 configuration
 + proton, 0 degree, 10-5-1 GeV/c, tower 3
 + proton, 30 degrees, 10-5-1 GeV/c, tower 3 (gia fatto mi sembra)
 + proton, 60 degrees, 10-5-1 GeV/c, tower 3

- total estimated time 90hrs

see shift list for detailed program and settings 

part 

CU config

time

status

 note

 2.5 full-brem

twr3 0 deg

5

done

 

 tagged full-spectrum

twr3 0 deg

12.5

 2.5 gev primary done

  interrupted after 2.5gev becasue of low beam rate today

 tagged full-spectrum

twr3 30 deg in the crack

12.5

 

do 2.5,1,0.5,1.5 might reduce to 2.5 and 1 (5 hrs) if needed

 tagged full-spectrum

twr3 30 deg reduced path length

12.5 

 

 "

 tagged full-spectrum

 twr3 10 deg

12.5

 

 "

 tagged full-spectrum

twr3 20 deg

12.5 

 

 "

 2.5 full brem

albedo 2 (145 deg just above cal, from steve)

 

 

 tagger low-energy setup calibration

 

8

 

 

 tagger low-energy

twr3 0 deg

 5

 

 

 tagger low-energy

twr3 conf 1

 5

 

 

 Electron runs

see shift list for detailed program and settings 

part 

 energy

CU conf 

estimated time 

 schedule

purpose 

 e

 5

 many

 8

 17/8 swing

 e scan

 e

 5

 24

 3

 

 twr 1 cross-range calibration

Positron runs

setup trigger scintillators before MMS target

take 1M e+ and 1M e-

Proton runs

2. study pedestal drift vs rate:

p at 10 GeV setting LAT threshold to 5 DAC - repeat

Special runs

2. CAL FHE study : check DAV-MeV conversion, efficiency
+++ BT-17 to BT-21 configurations
+ electrons, 0 degree, 5GeV/c, tower 3,
FHE=500MeV-750MeV-1000MeV-1500MeV-2000MeV
+ electrons, 45 degree, 5GeV/c, tower 3,
FHE=500MeV-750MeV-1000MeV-1500MeV-2000MeV3. Calibrate Tower 1 cal : CAL FM109, position scan for inter-calibration
+++ BT-16 configurations
+ electrons, 0 degrees, 5GeV/c, tower 1

Pile-up verification runs

Setup a random trigger and take couple of quick runs (20k evts) in random trigger to directly measure pile-up events;

 Electron for CAL calibration - total estimated time 3hrs

 beam energy

CU position and impact point

 CU configuration

tagged

statistics 

estimated time (hrs) 

purpose 

  5 

 0 degrees through twr1, 12 positions x 2(XY)

 BT16 (4rng, NZS,ext trigger)

NA

10k per 12 pos

3

scan logs for intercalibration, verify if need to redo calibrations after pile-up rejection