Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

part 

CU config

time

status

 note

schedule 

 2.5 full-brem

twr3 0 deg

5

done
 

 

 tagged full-spectrum

twr3 0 deg

12.5

 2.5 gev primary done

  interrupted after 2.5gev becasue of low beam rate today

 

 tagged full-spectrum

twr3 30 deg in the crack

12.5

 

do 2.5,1,0.5,1.5 might reduce to 2.5 and 1 (5 hrs) if needed

 

 tagged full-spectrum

twr3 30 deg reduced path length

12.5 

 

 "

 

 tagged full-spectrum

 twr3 10 deg

12.5

 

 "

 

 tagged full-spectrum

twr3 20 deg

12.5 

 

 "

 

 2.5 full brem

albedo 2 (145 deg just above cal, from steve)

 

 

 

 tagger low-energy setup calibration

 

8
 

 

 

 tagger low-energy

twr3 0 deg

 5

 

 

 

 tagger low-energy

twr3 conf 1

 5

 

 

 

 Electron runs

see shift list for detailed program and settings 

part 

 energy

CU conf 

estimated time 

 schedule

purpose 

 e

 5

 many

 8

 17/8 swing

 e scan

 e

 5

 24

 3

 

 twr 1 cross-range calibration

Positron runs

setup trigger scintillators before MMS target

take 1M e+ and 1M e-

Proton runs

2. study pedestal drift vs rate:

...