COllection of proposed data taking configurations
discussion 17-8
Summary plan
Collection COllection of proposed data taking configurations
Photons - total estimated time 90hrs
part | CU config | time | status | note | schedule |
---|---|---|---|---|---|
2.5 full-brem | twr3 0 deg | 5 | done |
|
|
tagged full-spectrum | twr3 0 deg | 12.5 | 2.5 gev primary done | low interrupted after 2.5gev becasue of low beam rate today |
|
tagged full-spectrum | twr3 30 deg in the crack | 12.5 |
| do 2.5,1,0.5,1.5 might reduce to 2.5 and 1 (5 hrs) if needed |
|
tagged full-spectrum | twr3 30 deg reduced path length | 12.5 |
| " |
|
tagged full-spectrum | twr3 10 deg | 12.5 |
| " |
|
tagged full-spectrum | twr3 20 deg | 12.5 |
| " |
|
2.5 full brem | albedo 2 (145 deg just above cal, from steve) | 5 |
|
|
|
tagger low-energy setup calibration |
| 8 |
|
|
|
tagger low-energy | twr3 0 deg | 5 |
|
|
|
tagger low-energy | twr3 conf 1 | 5 |
|
|
|
Electron runs
part | energy | CU conf | estimated time | schedule | purpose |
---|---|---|---|---|---|
e | 5 | many | 8 | 17/8 swing | e scan |
e | 5 | 24 | 3 |
| twr 1 cross-range calibration |
Proton runs
part | energy | CU conf | estimated time | schedule |
---|---|---|---|---|
| ||||
|
Special runs
CAL FHE study : check DAV-MeV conversion, efficiency
Detailed plan
Photons
beam energy | CU position and impact point | CU configuration | tagged | statistics | estimated time (hrs) | purpose | status | |||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2.5 | 0 degrees through twr3 | BT1 | no (full-brem) | 2M | 5 (overnight) | PSF for flight tower | DONE | |||||||||
2.5 | " | " | yes | 100K | 2.5 | PSF+Erecon for flight tower | DONE | |||||||||
1.5 | " | " | yes | 100k | 2.5 | " |
| |||||||||
1 | " | " | yes | 100K | 2.5 | " |
| |||||||||
0.5 | " | " | yes | 150k | 4 | " |
| |||||||||
2.5 30 | degrees impact twr3 through twr2 twr3 30 deg in the crack | " | yes | 100k | 2.5 | PSF+Erecon tower dependence |
| |||||||||
1.5 | " | " | yes | 100k | 2.5 | " |
| |||||||||
1 | " | " | yes | 100k | 2.5 | " |
| |||||||||
0.5 | " | " | yes | 150k | 4 | " | 1 | 20 degrees, impact on twr3 through twr2, impact point 1 | " | yes | 100k | |||||
2 2.5 | twr3 30 deg reduced path length | |||||||||||||||
1 | Erecon | 1 | 20 degrees, impact on twr3 through twr2, impact point 2 | " | yes | 100k | 2.5 | " | 0.5 |
| tagger calibration for 100mev gammas |
|
|
| 8 | move tagger, improve resolution for 500mev primary beam |
0.5 | 0 degrees through twr3 |
|
| 150K | 5 | PSF+Erecon for flight tower for 100mev well-tagged gammas | ||||||||||
0.5 | 30 degrees impact twr3 through twr2 |
|
| 150K | 5 | PSF+Erecon for flight tower for 100mev well-tagged gammas | ||||||||||
0.5 | 20 degrees, impact on twr3 through twr2, impact point 1 |
|
| 150K | 5 | PSF+Erecon for flight tower for 100mev well-tagged gammas |
Electron for CAL calibration - total estimated time 3hrs
beam energy | CU position and impact point | CU configuration | tagged | statistics | estimated time (hrs) | purpose |
---|---|---|---|---|---|---|
5 | 0 degrees through twr1, 12 positions x 2(XY) | BT16 (4rng, NZS,ext trigger) | NA | 10k per 12 pos | 3 | scan logs for intercalibration, verify if need to redo calibrations after pile-up rejection |
CAL FHE study : check DAV-MeV conversion, efficiency
+++ BT-17 to BT-21 configurations
+ electrons, 0 degree, 5GeV/c, tower 3,
FHE=500MeV-750MeV-1000MeV-1500MeV-2000MeV
+ electrons, 45 degree, 5GeV/c, tower 3,
FHE=500MeV-750MeV-1000MeV-1500MeV-2000MeV
Proton runs
1. study nuclear interactions : shape in CAL and TKR, Mip Finder, check MC
+++ BT-1 configuration
+ proton, 0 degree, 10-6 GeV/c, tower 3
+ proton, 60 degrees, 10-6 GeV/c, tower 3
2. study pedestal drift vs rate:
p at 10 GeV setting LAT threshold to 5 DAC
3. p run with muon settings to check standard ground calibration with CR with real MIPs
Pile-up verification runs
Setup a random trigger and take couple of quick runs (20k evts) in random trigger to directly measure pile-up events - setup should be done in parallel
discussion 16-8
Photons - total estimated time 56h
| ||||||||||||||||||||
1 | " | " | yes | 100k | 2.5 | Erecon |
| |||||||||||||
0.5 | " | " | yes | 150K | 4 | Erecon |
| |||||||||||||
2.5 | 10deg tower 3 | " | yes | 100K | 2.5 | Erecon |
| |||||||||||||
1.5 | " | " | " | " | " | " |
| |||||||||||||
1 | " | " | " | " | " | " |
| |||||||||||||
0.5 | " | " | " | " | " | " |
| |||||||||||||
2.5 | 20deg tower 3 | " | " | " | " | " |
| |||||||||||||
beam energy | CU position and impact point | CU configuration | tagged | statistics | estimated time (hrs) | purpose | ||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2.5 | 0 degrees through twr3 | BT1 | no (full-brem) | 2M | 5 (overnight) | PSF for flight tower | ||||||||||||||
2.5 | " | " | yes | 100K | 2.5 | PSF+Erecon for flight tower | ||||||||||||||
1.5 | " | " | yes | 100k | 2.5 | " | ||||||||||||||
1 | " | " | yes | 100K | 2.5 | " | ||||||||||||||
0.5 | " | " | yes | 150k | 4 | " | ||||||||||||||
2.5 | 30 degrees impact twr3 through twr2 | " | yes | 100k | 2.5 | PSF+Erecon tower dependence | ||||||||||||||
1.5 | " | " | yes " | 100k | " | " 2.5 | " |
| ||||||||||||
1 | " | " | yes " | 100k | " | " 2.5 | " |
| ||||||||||||
0.5 | " | " | yes | 150k | 4 " | " | 1 | 20 degrees, impact on twr3 through twr2, impact point 1 | " | yes | 100k | 2.5 | Erecon | 1 | 20 degrees, impact on twr3 through twr2, impact point 2 | " | yes | 100k | 2.5 | " |
0.5 | tagger calibration for 100mev gammas |
|
|
| 8 | move tagger, improve resolution for 500mev primary beam |
| |||||||||||||
0.5 | 0 degrees through twr3 |
|
| 150K | 5 | PSF+Erecon for flight tower for 100mev well-tagged gammas |
| |||||||||||||
0.5 | 30 degrees impact twr3 through twr2 |
|
| 150K | 5 | PSF+Erecon for flight tower for 100mev well-tagged gammas |
| |||||||||||||
0.5 | 20 degrees, impact on twr3 through twr2, impact point 1 |
|
| 150K | 5 | PSF+Erecon for flight tower for 100mev well-tagged gammas |
|
Electron for CAL calibration - total estimated time 3hrs
beam energy | CU position and impact point | CU configuration | tagged | statistics | estimated time (hrs) | purpose |
---|---|---|---|---|---|---|
5 | 0 degrees through twr1, 12 positions x 2(XY) | BT16 (4rng, NZS,ext trigger) | NA | 10k per 12 pos | 3 | scan logs for intercalibration, verify if need to redo calibrations after pile-up rejection |
CAL CAL FHE study : check DAV-MeV conversion, efficiency
+++ BT-17 to BT-21 configurations
+ electrons, 0 degree, 5GeV/c, tower 3,
FHE=500MeV-750MeV-1000MeV-1500MeV-2000MeV
+ electrons, 45 degree, 5GeV/c, tower 3,
FHE=500MeV-750MeV-1000MeV-1500MeV-2000MeV
Proton runs
...
+ proton, 0 degree, 10-6 GeV/c, tower 3
+ proton, 60 degrees, 10-6 GeV/c, tower 32. study pedestal drift vs rate:
p at 10 GeV setting LAT threshold to 5 DAC 3. p run with muon settings to check standard ground calibration with CR with real MIPs- repeat
Pile-up verification runs
Setup a random trigger and take couple of quick runs (20k evts) in random trigger to directly measure pile-up events - setup should be done in parallel paralle