Photons - total estimated time
part | CU config | time | status | note | schedule |
---|---|---|---|---|---|
2.5 full-brem | twr3 0 deg | 5 | done |
|
|
tagged full-spectrum | twr3 0 deg | 12.5 | 2.5 gev primary done | low beam rate today |
|
tagged full-spectrum | twr3 30 deg in the crack | 12.5 |
| do 2.5,1,0.5,1.5 might reduce to 2.5 and 1 (5 hrs) if needed |
|
tagged full-spectrum | twr3 30 deg reduced path length | 12.5 |
| " |
|
tagged full-spectrum | twr3 10 deg | 12.5 |
| " |
|
tagged full-spectrum | twr3 20 deg | 12.5 |
| " |
|
2.5 full brem | albedo 2 (145 deg just above cal, from steve) | 5 |
|
|
|
tagger low-energy setup calibration |
| 8 |
|
|
|
tagger low-energy | twr3 0 deg | 5 |
|
|
|
tagger low-energy | twr3 conf 1 |
|
|
|
|
beam energy | CU position and impact point | CU configuration | tagged | statistics | estimated time (hrs) | purpose |
---|---|---|---|---|---|---|
2.5 | 0 degrees through twr3 | BT1 | no (full-brem) | 2M | 5 (overnight) | PSF for flight tower |
2.5 | " | " | yes | 100K | 2.5 | PSF+Erecon for flight tower |
1.5 | " | " | yes | 100k | 2.5 | " |
1 | " | " | yes | 100K | 2.5 | " |
0.5 | " | " | yes | 150k | 4 | " |
2.5 | 30 degrees impact twr3 through twr2 | " | yes | 100k | 2.5 | PSF+Erecon tower dependence |
1.5 | " | " | yes | 100k | 2.5 | " |
1 | " | " | yes | 100k | 2.5 | " |
0.5 | " | " | yes | 150k | 4 | " |
1 | 20 degrees, impact on twr3 through twr2, impact point 1 | " | yes | 100k | 2.5 | Erecon |
1 | 20 degrees, impact on twr3 through twr2, impact point 2 | " | yes | 100k | 2.5 | " |
0.5 | tagger calibration for 100mev gammas |
|
|
| 8 | move tagger, improve resolution for 500mev primary beam |
0.5 | 0 degrees through twr3 |
|
| 150K | 5 | PSF+Erecon for flight tower for 100mev well-tagged gammas |
0.5 | 30 degrees impact twr3 through twr2 |
|
| 150K | 5 | PSF+Erecon for flight tower for 100mev well-tagged gammas |
0.5 | 20 degrees, impact on twr3 through twr2, impact point 1 |
|
| 150K | 5 | PSF+Erecon for flight tower for 100mev well-tagged gammas |
Electron for CAL calibration - total estimated time 3hrs
beam energy | CU position and impact point | CU configuration | tagged | statistics | estimated time (hrs) | purpose |
---|---|---|---|---|---|---|
5 | 0 degrees through twr1, 12 positions x 2(XY) | BT16 (4rng, NZS,ext trigger) | NA | 10k per 12 pos | 3 | scan logs for intercalibration, verify if need to redo calibrations after pile-up rejection |
CAL FHE study : check DAV-MeV conversion, efficiency
+++ BT-17 to BT-21 configurations
+ electrons, 0 degree, 5GeV/c, tower 3,
FHE=500MeV-750MeV-1000MeV-1500MeV-2000MeV
+ electrons, 45 degree, 5GeV/c, tower 3,
FHE=500MeV-750MeV-1000MeV-1500MeV-2000MeV
Proton runs
1. study nuclear interactions : shape in CAL and TKR, Mip Finder, check MC
+++ BT-1 configuration
+ proton, 0 degree, 10-6 GeV/c, tower 3
+ proton, 60 degrees, 10-6 GeV/c, tower 3
2. study pedestal drift vs rate:
p at 10 GeV setting LAT threshold to 5 DAC
3. p run with muon settings to check standard ground calibration with CR with real MIPs
Pile-up verification runs
Setup a random trigger and take couple of quick runs (20k evts) in random trigger to directly measure pile-up events - setup should be done in parallel
discussion 16-8
Photons - total estimated time 56h
beam energy | CU position and impact point | CU configuration | tagged | statistics | estimated time (hrs) | purpose |
---|---|---|---|---|---|---|
2.5 | 0 degrees through twr3 | BT1 | no (full-brem) | 2M | 5 (overnight) | PSF for flight tower |
2.5 | " | " | yes | 100K | 2.5 | PSF+Erecon for flight tower |
1.5 | " | " | yes | 100k | 2.5 | " |
1 | " | " | yes | 100K | 2.5 | " |
0.5 | " | " | yes | 150k | 4 | " |
2.5 | 30 degrees impact twr3 through twr2 | " | yes | 100k | 2.5 | PSF+Erecon tower dependence |
1.5 | " | " | yes | 100k | 2.5 | " |
1 | " | " | yes | 100k | 2.5 | " |
0.5 | " | " | yes | 150k | 4 | " |
1 | 20 degrees, impact on twr3 through twr2, impact point 1 | " | yes | 100k | 2.5 | Erecon |
1 | 20 degrees, impact on twr3 through twr2, impact point 2 | " | yes | 100k | 2.5 | " |
0.5 | tagger calibration for 100mev gammas |
|
|
| 8 | move tagger, improve resolution for 500mev primary beam |
0.5 | 0 degrees through twr3 |
|
| 150K | 5 | PSF+Erecon for flight tower for 100mev well-tagged gammas |
0.5 | 30 degrees impact twr3 through twr2 |
|
| 150K | 5 | PSF+Erecon for flight tower for 100mev well-tagged gammas |
0.5 | 20 degrees, impact on twr3 through twr2, impact point 1 |
|
| 150K | 5 | PSF+Erecon for flight tower for 100mev well-tagged gammas |
Electron for CAL calibration - total estimated time 3hrs
beam energy | CU position and impact point | CU configuration | tagged | statistics | estimated time (hrs) | purpose |
---|---|---|---|---|---|---|
5 | 0 degrees through twr1, 12 positions x 2(XY) | BT16 (4rng, NZS,ext trigger) | NA | 10k per 12 pos | 3 | scan logs for intercalibration, verify if need to redo calibrations after pile-up rejection |
CAL FHE study : check DAV-MeV conversion, efficiency
+++ BT-17 to BT-21 configurations
+ electrons, 0 degree, 5GeV/c, tower 3,
FHE=500MeV-750MeV-1000MeV-1500MeV-2000MeV
+ electrons, 45 degree, 5GeV/c, tower 3,
FHE=500MeV-750MeV-1000MeV-1500MeV-2000MeV
Proton runs
1. study nuclear interactions : shape in CAL and TKR, Mip Finder, check MC
+++ BT-1 configuration
+ proton, 0 degree, 10-6 GeV/c, tower 3
+ proton, 60 degrees, 10-6 GeV/c, tower 3
...
3. p run with muon settings to check standard ground calibration with CR with real MIPs
Pile-up verification runs
Setup a random trigger and take couple of quick runs (20k evts) in random trigger to directly measure pile-up events - setup should be done in parallel
...