Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

 beam energy

CU position and impact point

 CU configuration

tagged

statistics 

estimated time (hrs) 

purpose 

  5 

 0 degrees through twr1, 12 positions x 2(XY)

 BT16 (4rng, NZS,ext trigger)

NA

10k per 12 pos

3

scan logs for intercalibration, verify if need to redo calibrations after pile-up rejection

 

 

1. study nuclear interactions : shape in CAL and TKR, Mip Finder, check MC
+++ BT-1 configuration
 + proton, 0 degree, 10-5-1 GeV/c, tower 3
 + proton, 30 degrees, 10-5-1 6 GeV/c, tower 3 (gia fatto mi sembra)
 + proton, 60 degrees, 10-5-1 6 GeV/c, tower 3

2. CAL FHE study : check DAV-MeV conversion, efficiency
+++ BT-17 to BT-21 configurations
+ electrons, 0 degree, 5GeV/c, tower 3,
FHE=500MeV-750MeV-1000MeV-1500MeV-2000MeV
+ electrons, 45 degree, 5GeV/c, tower 3,
FHE=500MeV-750MeV-1000MeV-1500MeV-2000MeV3. Calibrate Tower 1 cal : CAL FM109, position scan for inter-calibration
+++ BT-16 configurations
+ electrons, 0 degrees, 5GeV/c, tower 1