Hybrid #

Received

Passive components loaded / cleaned

Sent to UCSC

APV25s loaded

Wirebonded

Tested

Results

Sent to SLAC

Glued to carbon fiber

Part of half-module

Notes

Hybrid 0

10/10/11(RH)

?

?

?

?

test 1

?

?

?

Half-module 0

COMPLETE

Hybrid 1

10/10/11(RH)

?

2/1/12(PH,VF)

2/1/12(FM)

2/3/12(FM)

2/14/12 OM test 1

OK

2/22/12(OM)

2/23/12(TKN)

Half-module 1

COMPLETE

Hybrid 0t

2/21/12(RH)

2/22/12(RH)

2/23/12(AG)

2/24/12(FM)

2/27/12(FM)

2/29/12 OM test 1

OK

2/29/12(OM)

3/1/12(TKN)

Half-module 2

COMPLETE

Hybrid 1t

2/21/12(RH)

3/5/12(RH/PH)

3/5/12(PH)

3/6/12(FM)

3/7/12(FM)

3/7/12(OM) test 1

OK

3/7/12(JN)

3/10/12(TKN)

Half-module 3

COMPLETE

Hybrid 2t

2/21/12(RH)

3/5/12(RH/PH)

3/5/12(PH)

3/6/12(FM)

3/7/12(FM)

3/7/12(OM) test 1

OK

3/7/12(JN)

3/10/12(TKN)

Half-module 4

COMPLETE

Hybrid 3t

2/21/12(RH)

3/5/12(RH/PH)

3/5/12(PH)

3/6/12(FM)

3/7/12(FM)

3/7/12(OM) test 1

OK

3/7/12(JN)

3/10/12(TKN)

Half-module 5

COMPLETE

Hybrid 4t

2/21/12(RH)

3/14/12(RH/PH)

3/14/12(PH)

3/14/12(FM)

3/15/12(FM)

3/15/12 (VF, OM) test 1
3/15/12 test 2
3/15/12 test 3
3/16/12 test 4
3/16/12 test 5

Bad channel 466, else OK.

3/16/12 (PH)

3/20/12(TKN)

Half-module 9

COMPLETE

Hybrid 5t

2/21/12(RH)

3/14/12(RH/PH)

3/14/12(PH)

3/14/12(FM)

3/15/12(FM)

3/15/12 (VF)

V125, AVDD, GND shorts => no readout test

3/16/12 (PH)

-

-

-

5t continued

-

-

-

-

-

3/23/12(PH) test 1
3/23/12(PH) test 2
3/23/12(PH) test 3
3/23/12(PH) test 4
3/23/12(PH) test 5
3/23/12(PH) test 6

After connector pinout fixed: channel 417 dead, else OK

-

3/27/12(TKN)

Half-module 21

COMPLETE 

Hybrid 6t

2/21/12(RH)

3/14/12(RH/PH)

3/14/12(PH)

Not loaded, loose connector wire(FM, VF)

back to SLAC

-

-

3/16/12 (PH)

-

-

continued on next line...

6t continued

-

-

3/19/12(TKN/VF)

3/19/12(FM)

3/20/12 (FM)

3/20/12 (OM)
test 1

Bad channel 345, else OK.

3/20/12 (VF)

3/22/12(TKN)

Half-module 12

COMPLETE

Hybrid 7t

2/21/12(RH)

3/15/12(RH/PH/TKN)

3/16/12(PH)

3/16/12 (FM)

3/17/12 (FM)

3/17/12 (TC,VF) test 1

OK

3/18/12 (VF)

3/18/12(TKN)

Half-module 6

COMPLETE

Hybrid 8t

2/21/12(RH)

3/15/12(RH/PH/TKN)

3/16/12(PH)

3/16/12 (FM)

3/17/12 (FM)

3/17/12 (TC,VF) no data
3/18/12 test 1
3/18/12 test 2
3/18/12 test 3

APV0 defective? Could not set defaults => No test results.

?

?

Half-module ?

Needs further testing

Hybrid 9t

2/21/12(RH)

3/15/12(RH/PH/TKN)

3/16/12(PH)

3/16/12 (FM)

3/17/12 (FM)

3/17/12 (TC,VF) test 1

Problems testing with DAQ

3/18/12 (VF)

?

Half-module ?

Needs further testing

Hybrid 10t

2/21/12(RH)

3/15/12(RH/PH/TKN)

3/16/12(PH)

3/16/12 (FM)

3/17/12 (FM)

3/17/12 (TC,VF) test 1

OK

3/18/12 (VF)

3/18/12(TKN)

Half-module 7

COMPLETE

Hybrid 11t

2/21/12(RH)

3/15/12(RH/PH/TKN)

3/16/12(PH)

3/16/12 (FM)

3/17/12 (FM)

3/17/12 (TC,VF) test 1

OK

3/18/12 (VF)

3/18/12(TKN)

Half-module 8

COMPLETE

Hybrid 12t

2/21/12(RH)

3/15/12(RH/PH/TKN)

3/16/12(PH)

Not loaded, b/c of gauge mark on ASIC pad.

N/A

N/A

N/A

3/18/12 (VF)

?

Half-module ?

Salvage connector?

Hybrid 13t

2/21/12(RH)

3/15/12(RH/PH/TKN)

3/16/12(PH)

3/19/12 (FM)

3/20/12 (FM)

3/20/12 (OM) test 1

OK

3/20/12 (VF)

3/20/12(TKN)

Half-module 10

COMPLETE

Hybrid 14t

2/21/12(RH)

3/15/12(RH/PH/TKN)

3/16/12(PH)

3/19/12 (FM)

3/20/12 (FM)

3/20/12 (OM) test 1

OK

3/20/12 (VF)

3/20/12(TKN)

Half-module 11

COMPLETE

Hybrid 15t

2/21/12(RH)

3/15/12(RH/PH/TKN)

3/16/12(PH)

3/19/12 (FM)

3/20/12 (FM)

3/19/12 (OM) test 1
3/19/12 test 2

OK

3/20/12 (VF)

3/22/12(TKN)

Half-module 13

COMPLETE

Hybrid 16t

2/21/12(RH)

3/15/12(RH/PH/TKN)

3/16/12(PH)

3/19/12 (FM)

3/20/12 (FM)

3/20/12 (OM) test 1

OK

3/20/12 (VF)

3/22/12(TKN)

Half-module 14

COMPLETE

Hybrid 17t

2/21/12(RH)

3/16/12(PH)

3/19/12(TKN/VF)

3/19/12 (FM)

3/20/12 (FM)

3/20/12 (OM) test 1

OK

3/20/12 (VF)

3/23/12(TKN)

Half-module 15

COMPLETE

Hybrid 18t

2/21/12(RH)

3/16/12(PH)

3/19/12(TKN/VF)

3/19/12 (FM)

3/20/12 (FM)

3/20/12 (OM) test 1

OK

3/20/12 (VF)

3/23/12(TKN)

Half-module 16

COMPLETE

Hybrid 19t

2/21/12(RH)

3/16/12(PH)

3/19/12(TKN/VF)

3/19/12 (FM)

3/20/12 (FM)

3/20/12 (OM) test 1

Bad channel 254, else OK

3/20/12 (VF)

3/23/12(TKN)

Half-module 17

COMPLETE

Hybrid 20t

3/21/12(RH)

3/22/12(PH)

3/23/12(PH)

3/23/12(FM)

3/24/12(FM)

3/24/12 (OM,VF) test 1
test 2

OK

3/26/12(VF,PH)

3/26/12(TKN)

Half-module 18

COMPLETE

Hybrid 21t

3/21/12(RH)

3/22/12(PH)

3/23/12(PH)

3/23/12(FM)

3/24/12(FM)

3/24/12 (OM,VF)test 1
test 2

OK

3/26/12(VF,PH)

3/26/12(TKN)

Half-module 19

COMPLETE

Hybrid 22t

3/21/12(RH)

3/22/12(PH)

3/23/12(PH)

3/23/12(FM)

3/24/12(FM)

3/24/12 (OM,VF)test 1

OK

3/26/12(VF,PH)

3/27/12(TKN)

Half-module 22

COMPLETE 

Hybrid 23t

3/21/12(RH)

3/22/12(PH)

3/23/12(PH)

3/23/12(FM)

3/24/12(FM)

3/24/12 (OM,VF)test 1
test 2

OK

3/26/12(VF,PH)

3/27/12(TKN)

Half-module 23

COMPLETE 

Hybrid 24t

3/21/12(RH)

3/22/12(PH)

3/23/12(PH)

3/23/12(FM)

3/24/12(FM)

3/24/12 (OM,VF) test 1
test 2

OK

3/26/12(VF,PH)

3/26/12(TKN)

Half-module 20

COMPLETE

Hybrid 25t

3/21/12(RH)

3/29/12(PH)

3/29/12(PH)

3/29/12(FM)

3/30/12(FM)

3/30/12(OM) test 1
3/30/12test 2

OK

3/30/12(AG,VF)

3/30/12 (TKN)

Half-module 24

COMPLETE

Hybrid 26t

3/21/12(RH)

3/29/12(PH)

3/29/12(PH)

3/29/12(FM)

3/29/12(FM)

3/30/12(OM) test 1

OK

3/30/12(AG,VF)

3/30/12 (TKN)

Half-module 25

COMPLETE

Hybrid 27t

3/21/12(RH)

3/29/12(PH)

3/29/12(PH)

3/29/12(FM)

3/29/12(FM)

3/30/12(OM) test 1

OK

3/30/12(AG,VF)

3/30/12 (TKN)

Half-module 26

COMPLETE

Hybrid 28t

3/21/12(RH)

3/30/12(PH)

3/30/12(AG,VF)

3/30/12(FM)

4/01/12(FM)

4/01/12(VF) test 1

OK

4/1/12(PH)

4/1/12(TKN)

Half-module 28

COMPLETE

Hybrid 29t

3/21/12(RH)

3/30/12(PH)

3/30/12(AG,VF)

3/30/12(FM)

4/01/12(FM)

4/01/12(VF) test 1

OK

4/1/12(PH)

4/1/12(TKN)

Half-module 29

COMPLETE

Hybrid 30t

3/21/12(RH)

3/30/12(PH)

3/30/12(AG,VF)

3/30/12(FM)

4/01/12(FM)

4/01/12(VF) test 1

Chans 203, 300-302 have pronounced baseline tails, others are OK.

4/1/12(PH)

4/1/12(TKN)

Half-module 27

COMPLETE

Adding a hybrid to the production database

To add a hybrid, copy the line below into the table and fill in the ?s.

|[Hybrid ?] | ? | ? | ? | ? | ? | ? [test 1|Hybrid ?, test 1]| ? | ? | ? |[Half-module ?]| |

The below link creates the hybrid page. Enter the hybrid ID once for each page that follows, and save the resulting page.

Adding a set of QA tests

On the hybrid page, click the link to add a test page. Enter the hybrid ID, test number and any notes in the template when prompted. You can also edit the page to record the APV25 settings and other test conditions in the table.

The hybrid page gets created with an excerpt box for the first test; copy the wiki markup for further tests.

The production table starts with an entry for one test; add a newline inside the table to add further tests.

Hybrid Documentation (schematics, layout, etc.)

HPS Hybrid Confluence Page

Hybrid Channel Numbering

DAQ readout ordering translates to channels on the hybrids as follows:

Sensor channel 0 is at the top of the drawing, so sensor channel = (4 - APV)*128 + channel

  • No labels