This serves as a guide for moving the Jungfrau detector off and onto the DSA location.

Step-by-step guide


NOTE: It is good practice to check that vacuum levels are at atmospheric conditions (760 torr) prior to disconnecting flanges. This should be checked on the control screens and manual gauges.

  1. Disconnect both 14" flanges on each end of the Jungfrau. The screws will act as guide posts for pulling back the bellows. Note: There were interference issues with the Optique Peter, on the top 4 screws of the flange, located in the +z direction. 
  2. Slowly pull back the bellows and secure the 3 handles onto the lead screws and foil off all vacuum side components. This requires a minimum effort of 2 people.

                                                                                                             

Crane preparation for the 14" flange+stand:

  1. Remove all 4 bolts securing the stand to the platform. Note: Consult the CXI crane book for the most current lift plan and check for completion of the daily crane inspection.

                                                                                                             

Removal of the 2 Turbos:

  1. Remove the flange sitting on top of the 2 turbos to gain access to the bracket holder port. This secures the umbilical cord located inside the Jungfrau.

2. 3 silver plated bolts are removed to disengage the bracket holding the umbilical cord. These are no longer capture and release screws.


This guide is still in progress.



  • No labels