In the end we have three ICD, two pertain to how the controls between SLAC experiment controls and respective laser systems are interfaced, one pertains to how controls in general works with the rest of the project.
LLE and LLNL of course interface as they need to within their own WBS.
Requirements review underway for LCLS for motion and vacuum for HE
Look for these sets to be shared in the coming weeks
Alex Wallace share the motion and vacuum requirements reviews from Jama for MECU collective
Action items
Past meeting AI
Description
Due date
Assignee
Task appears on
Meeting time may change to Thursday at 1pm if it satisfies everyone's schedules. Conflict arose for Bruce (New LLE team member for 10am on Thursday).
AD, how ACR operates the machine using high-level applications (Matlab and Python), Alex Wallace ping Greg White, et al for someone to talk to the collective about it.