Preparing the agenda for the SLAC portion of the review.
What |
Who |
Duration |
Start |
Stop |
---|---|---|---|---|
Introduction |
David |
10 |
13:00 |
13:10 |
Hardware Facilities |
Randy/Don |
|
|
|
BaBar archival analysis system |
|
|
|
|
ATLAS T2 (T3 Analysis) |
|
|
|
|
Fermi, LSST, DES, CTA, KIPAC |
|
|
|
|
SCA tools: EXO-200, SuperCDMS, xrootd, SciDB/XLDB |
|
|
|
|
GEANT4 |
|
|
|
|
LCSim (and Dark Photon) |
|
|
|
|
inSpire |
|
|
|
|
Theory: BlackHat |
|
|
|
|
Accelerator modelling |
|
|
|
|
Cosmology initiative |
|
|
|
|
Summary: Coherent vision for the future & what would be funded by a dedicated computer budget line |
|
|
|
|
Budget and |
David |
15 |
14:45 |
15:00 |
SLAC is assigned two hours. We can try to justify asking for more if needed. Considerations from the charge:
- cosmology computing
- accelerator simulation
- budget for PPA
- hardware install at lab
- recharge model
- intro (David plans to do intro and budget; budget talk last)
- LCSim
- theory stuff? generators? Blackhat?
- G4, xrootd as pan-Lab tools
- XLDB
- SCA tools
- effort distributed in collaborations (how to describe this?)
- ATLAS T2
- BABAR archival analysis system
- anything on LSST?
- planning for DES & CTA
- KIPAC computing
- FreeHEP, Wired: Funding?