Attendance:
Presentation:
Agenda/Notes:
- ePixM:
- Beamtime prep, Status:
- Install the ePixM at MFX beam dump
- Scheduled Time: Thursday, September 26, 12 pm - 2 pm.
- Setup check list: Fiber converter (with FTP fiber and 3 tranceivers), Power supply, Keithley Source meter (TID IC lab), power cable
- Move the setup to the beamtime table
- Next Monday 11am
- Physical setup to secure the camera; (Chris Koerber)
- Test the script for the beamtime data collection;
- Setting up the pre-setup meeting (include TID people);
- LCLS Daq for beamtime
- New register setting optimized for dynamic range
- Get the measurement plan (Zongde)
- Drafted
- Schedule the staffing;
- Install the ePixM at MFX beam dump
- Beamtime prep, Status: