Two test beam periods are scheduled in 2009 at CERN: May and October. These tests are crucial in view of validating the sensor for the IBL, but also for the SLHC tracker upgrade.

The test beam setup is based on two main components:
    - Silicon telescope (so called "Bonn" telescope) with is own DAQ
    - 3D assemblies read out by TurboDAQ (1 TurboDAQ per tested board). We shall have at least 3 TurboDAQ available, plus one in the lab (building 161).

Some notes from January 2009 meeting at SLAC:January 2009 meeting notes

Pictures from visit to the test beam area in CERN Prevessin

Some pictures of the building, beam line, cooling box, magnet, etc. can be found here.

Test Beam Analysis Information:

2009 Test Beam: