Power integration - ePixHrM electric cable specs

The cable goes from the detector box to the power supply and external monitoring instruments. It must feature a DBM25P032N on one side and BNC / bananas on the other side.

DBM25S032N Pins OUT - Male to Female

DBM25P032N

Signal name

HD 25 pins female

1

MPS

BNC

2

DGND

Banana

3

TG

BNC

4

DGND


5

DAQ

BNC

6

DGND


7

RUN

BNC

8

DGND


9

TTL_OUT

BNC

10

DGND


11

TTL_IN

BNC

12

DGND


13

THERM_IN

Banana

14

DGND


15

THERM_OUT

Banana

16

DGND


17

AGND

Banana

18

AGND


19

ANA_24V

Banana

20

ANA_24V


21

DIG_24V

Banana

22

DIG_24V


23

DGND


24

HV_GND

Banana

25

HV_BIAS

Banana




On the DBM25P032N side, the following pins must be connected together:

·         Pins 2,4,6,8,10,12,14,16,23

·         Pins 17 and 18

·         Pins 19 and 20

·         Pins 21 and 22


Cable length: 5.5ft


Twit cables used for:

·         DGND and DIG_24V

·         AGND and ANA_24V

·         HV_GND and HV_BIAS


DBM25S032N Connector


Final product

                      DBM25P032N  side                                                    Banana & BNC side


Data and timing cables


Necessary hardware for connecting data and timing

  • One 24 channel type B fiber MTP/MPO optics cable . If the detector is in vacuum, a fiber feed through needs to be used
  • Multimode to Single mode conversion box
    • image-2023-5-1_11-38-34.png
  • 4 40Gbps SM or MM transceivers for data. Either one or another,
  • 2 MTP/MPO Fiber optics cables
  • 1 40Gbps SM or MM transceiver for timing
  • MTP fiber breakout



The detector will be connected to the MM to SM converter box (input LEAP0) using the 24 channel type B cable. LEAP0 LANE[3:0] and LANE[7:4] ports will be connected to the data acquisition server. LANE[11:9] (namely lane 11) will be connected to the LCLSII timing system.