You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 6 Next »

List of things to do:

  • Start QNAP NAS (in S20 gallery) and ask Ken/Jeremy to mount it on all facet computers (facet-srv20, cpu-liXX-pmXX)
  • Test DAQ
  • Check pico motor servers are running
  • Check state of flippers. They might have gone to an unsafe state.
  • Home UPX stages. Do this only for stages you know are safe to move.
  • Test transmission through IP with alignment laser. The oven mover, actuators with foils or wire scanners may be in an undefined state.


Things to check:System owner:Notes:



Oven mover is in bypass positionDoug S.Required to clear MPS fault.
Retract the DS Be window Doug S. / Ivan
PB, spectrometer, and laser transport turbos onDoug S. / Ivan
When LCW is off: Ensure beamline valves inserted, DPS turbos and roughing pumps are OFF.Doug S.

When LCW is back on: DPS pumps restarted (US and DS turbos and roughing pumps).

  • VV 3172 retracted when vacuum is stable.
Ops / Doug S.DS Be window should be retracted first
DPS Vacuum watcher restartedOps / Doug S.
Spectrometer Camera Checkout ProcedureDoug S.









  • No labels