Attendees: 

Steven Back Barry Fishler Jing Yin Nate Landis Tyler Johnson John Cline Zachary L Lentz Robert S. Tang-Kong Peregrine McGehee Ricardo Martinez Martinez Vinod Gopalan Govednik, Janez Janos Vamosi 

Meeting Agenda

Previous Meeting Notes: 2023-09-26 MEC-U Project Controls and Data Systems Team Meetings

 

Approx. Time

Agenda ItemLinksNotes

40 min

Laser DR Recommendation Responses

https://app.smartsheet.com/reports/5QG4h4wQRRRJ32GVXR3wHr6Hc2Qx33fmG8mJH951

    • Responses should be entered in the "Notes" section. 
    • Controls Rec FY24-DR-16: Need a dedicated system engineer or lead to own the control system flowchart for automation. 
      • Maybe need to start with use-cases. 
      • Need assistance from system engineering team. 
      • Steven would like an example of the automation flowchart from LLNL and LLE. 
      • Workshop - Eric Cunningham would be a good resource to bring in. 
    • Barry Fishler Nate Landis Jing Yin to add input to recommendations in the "Notes" section. Alex Wallace to review and add input at a later time.  


5 mins

Review Jira Ticket Updates


  • Identify new Jira tickets and call for prioritization. 
  • Marked top priority items as critical. 
  • Mitchell Cabral will begin trying to tie due dates to each ticket. 
  • New ticket created to go over installation plan and phasing. 
  • Please enter any additional tickets as necessary. 
  • Reconfigured Jira board to order swimlanes by priority. 

25 mins

MEC-U Controls FMEA

  • Live document is uploaded to SharePoint. 
  • Starting with failures and causes then will send out to review for mitigations. 
  • Looping in system engineering next week to go over the project's FMEA process and where things will be stored. 

If time permits (we were not able to get to this)

EPICS Archiver


  • What type of data is LLNL hoping to capture with EPICS archiver? 
  • What does LLNL want to do with the data? 
    • Answering will help Zach to start determining what solution can be made to meet LLNL's needs. 
  • Proposal of proof of concept: 

    "This should be at 10Hz, and running a standard GigE Vision configuration (5 cameras per host)".

  • Related ticket MECUCOLLEC-14 - Getting issue details... STATUS

Next Meeting

Date

Objectives


 

  • Continue DAQ discussions.
    • If able, begin writing up some requirements on what the laser systems need. 
  • Chris has a proposal. 
IT Infrastructure Build Requirements Spreadsheet





Action Items:

DescriptionDue dateAssigneeTask appears on
  • Require concept for toggling power on/off to small motors (CosyLab contacted)
MEC-U Collective Team Meetings
  • Seeking existing SLAC solution for closed loop pointing stability loop (vision/motor)
MEC-U Collective Team Meetings
  • Require concept for toggling power on/off to GigE cameras (CosyLab contacted)
MEC-U Collective Team Meetings
  • Omar Quijano To work on documenting SLAC's IT infrastructure design including hardware specs and key information.
Omar Quijano2023-02-21 MEC-U Project Controls and Data Systems Team Meetings
  • Terzi, Ken To adjust some items on the presentation then send out to the group and Omar. Mitchell Cabral Will upload this to the Sharepoint.
Terzi, Ken2023-02-21 MEC-U Project Controls and Data Systems Team Meetings
Barry FishlerSet Point API WG pt.2
  • Jing Yin TPR Card Specification Stub (Specific question from Ken: Number of outputs for TTL? LVTTL or TTL? Both?)
Jing Yin2023-02-07 MEC-U Project Controls and Data Systems Team Meetings
Tyler Johnson2022-11-14 MEC-U Project Controls and Data Systems Team Meetings
  • SLAC to provide GUI standards for laser systems (standards in development.). Follow up. Mitchell Cabral 
Mitchell Cabral2022-11-03 MECU LLNL/SLAC Meeting
  • LLNL to share C++ standards for SLAC review. Follow up. Vinod Gopalan
Vinod Gopalan2022-11-03 MECU LLNL/SLAC Meeting