You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 7 Current »

Contents


Full recovery, from e.g. a CPU reboot or power outage

  1. CPU should be up, Master source IOCs sioc-sys0-ms0[1..6] should be running
    1. See Troubleshooting
  2. Open the MS/PRL main display
    1. See Displays
  3. Ensure that the MO is locked
    1. See MOLocker
  4. Ensure that all power amps are at their target power levels
    1. See PRLAmps
  5. Ensure that PRL loops are locked
    1. See PRLLoops


  • No labels