You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

The goal is to use the Tektronix DPO 7254 located in the EPP lab so generate a signal integrity report, using the 48 DP cables provided. Each cable has to be tested 10 times, channels 1/2 for transmission outputs CMD/DATA0-3.

Please refer to Andrew Young (ayoung@slac.standford.edu) for initial setup via Vivado Lab.

Once the setup is complete, follow these instructions to test and generate/save the needed report.

  • No labels