Follow up with LLE and LLNL AHJ to connect with SLAC EEIP to hopefully get Ch8 requirements satisfied by local authorities, avoid having to redo EEIP upon arrival at SLAC.
Develop the ICD approver list, send out the preliminary draft to the collective for consideration Alex Wallace
Past meeting AI
Description
Due date
Assignee
Task appears on
Require concept for toggling power on/off to small motors (CosyLab contacted)
AD, how ACR operates the machine using high-level applications (Matlab and Python), Alex Wallace ping Greg White, et al for someone to talk to the collective about it.